My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 03/10/2026
Ramsey
>
Public
>
Agendas
>
Council
>
2026
>
Agenda - Council - 03/10/2026
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/16/2026 4:37:32 PM
Creation date
3/6/2026 10:49:04 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
03/10/2026
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
374
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• June 30, 2026 Contractor completes improvements <br />The proposed improvements are designated as City Improvement Project #26-09, 2026 Crack Seal <br />Improvements. <br />Notification: <br />Advertisements were published in the Anoka Union Herald on January 30 and February 6, 2026. Bids were also <br />advertised on-line on Quest CDN. <br />Letters are not mailed to property owners for crack seal improvements due to the relatively minor impacts to <br />property owners and the traveling public during these projects. Engineering staff maintains a project webpage <br />which will be updated with the most current project information. <br />Time Frame/Observations/Alternatives: <br />Observations: <br />IP 26-09 and IP 26-10 engineer's estimates are based off of final plans and actual bid prices. IP 26-11 estimate is <br />a CIP level estimate based off of costs per mile. <br />Alternatives: <br />Motion to adopt Resolution #26-066 accepting bids and awarding a contract to MP Asphalt Maintenance for the <br />total amount of $149,478.00 for 2026 Crack Seal Improvements, Improvement Project #26-09. <br />Funding Source: <br />On March 3, 2026 a total of seven (7) bids were received, opened, and tabulated, and the following bids were <br />found to comply with the advertisement for bids. <br />Contractor Total Bid <br />MP Asphalt Maintenance $149,478.00 <br />FlowSeal Surface Maintenance $162,575.31 <br />Sealpros $175,476.00 <br />Northwest Asphalt Maintenance $191,150.02 <br />Allied Blacktop Company $199,949.80 <br />Asphalt Surface Technologies Corp. $214,055.70 <br />Fahrner Asphalt Sealers, LLC $222,745.44 <br />Engineer's Estimate $210, 345.00 <br />The bid of MP Asphalt Maintenance of Buffalo, Minnesota, in the amount of $149,478.00 for the total bid of said <br />improvements in accordance with the approved plans and specifications and advertisement for bids, is the lowest <br />responsible bidder. Adding indirect costs in the amount of 5-percent brings the total project costs to $156,951.90. <br />The bid is 25-percent less than the engineer's estimate. <br />The city budgeted $650,000 in 2026 for contracted street maintenance services including; crack sealing, <br />pavement rejuvenation, and refreshing pavement markings. <br />The estimated costs for pavement maintenance improvements are: <br />• IP 26-09 Crack Seal $156,951.90 <br />• IP 26-10 Pavement Rejuvenation $327,922.41 <br />• IP 26-11 MSA Pavement Markings $8,000 <br />• Total Pavement Maintenance Costs $492, 874.31 <br />o Staff recommends remaining budgeted funds be guided for pavement patching services as needed. <br />
The URL can be used to link to this page
Your browser does not support the video tag.