Alternative #2 — Motion of other.
<br />Funding Source:
<br />Funding for this improvement is proposed to come from Tax Increment Fund #1 and Storm Water Utility Funds.
<br />On March 3, 2026, a total of nine (9) bids were received, opened, and tabulated, and the following bids were
<br />found to comply with the advertisement for bids.
<br />Contractor Total Bid
<br />North Valley, Inc. $792,282.86
<br />Knife River Corporation — North Central $826,337.15
<br />Omann Brothers Paving, Inc. $865,221.89
<br />Park Construction Company $882,159.00
<br />GMH Asphalt Corporation $922,005.86
<br />Douglas -Kerr Underground, LLC $928,652.75
<br />Asphalt Surface Technologies Corp. $971,032.08
<br />Northwest $1,039,133.00
<br />New Look Contracting, Inc. $1,075,789.25
<br />Engineer's Estimate S1, 051, 312.50
<br />The bid of North Valley, Inc. of Nowthen, Minnesota, in the amount of $792,828.86 for the total bid of said
<br />improvements in accordance with the approved plans and specifications and advertisement for bids, is the lowest
<br />responsible bidder. Adding indirect costs in the amount of 23-percent brings the total project costs to $974,507.92.
<br />The bid is 25-percent less than the engineer's estimate, primarily due to lower than anticipated excavation,
<br />earthwork, and concrete costs.
<br />Funding Source Breakdown:
<br />Funding Source
<br />Tax Increment Fund #1
<br />Storm Sewer Utility
<br />Project Total
<br />Construction Costs
<br />$776,541.45
<br />$15,741.41
<br />$792,282.86
<br />Indirect Costs
<br />$178,604.53
<br />$3,620.53
<br />S182,225. 06
<br />Total Cost
<br />$955,145.98
<br />1$19,361.94
<br />$974,507.92
<br />Bolton & Menk has submitted a proposal for construction staking and as -built survey of said improvements for
<br />the total not -to -exceed amount of $43,110.00. Construction staking is included in the indirect costs, and is
<br />proposed to be paid for by TIF #1 and Storm Sewer Utility funds.
<br />The CIP level estimate had a total estimated project cost of $1,168,308, which includes street costs of $1,015,920
<br />and storm sewer costs of $152,388. The final project costs may change depending upon bid prices and actual
<br />construction quantities.
<br />City staff proposes to administer and inspect construction. Plans and specifications were prepared in-house as part
<br />of staff's normal duties.
<br />Recommendation:
<br />On January 20, 2026, the Ramsey Public Works Committee reviewed and recommended approval of the final
<br />plans. Additionally, the committee recommended placing temporary parking signs during concrete curb and gutter
<br />installation to assist residents in knowing where to park, versus providing written direction in letters to park on the
<br />north, south, east or west side of a street as some people may not know these directions. Public Works staff is in
<br />the process of making said signs for use during construction to better assist residents.