My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council Work Session - 02/13/2007
Ramsey
>
Public
>
Agendas
>
Council Work Session
>
2007
>
Agenda - Council Work Session - 02/13/2007
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/19/2025 9:59:56 AM
Creation date
2/9/2007 10:53:50 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council Work Session
Document Date
02/13/2007
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
51
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />PUBLIC WORKS <br />Objective: Provide quality and cost-effective public works services that meet City-wide <br />objectives. <br /> <br />Engineering Work Plan <br />1. Revise and update all water distribution, storm water system, and sanitary <br />sewer utility mapping. (On-going) <br />2. Create data base information for utilities and storm water management. <br />3. Update/revise 7 yr street maintenance schedule, looking at funding options <br />for future "high dollar" maintenance years. <br />4. Implemcnt 2005 portion of Capital Improvement Program il:Ild add all <br />proposed street maintenance programs identified in the 5 year CIP (Annual <br />revision) . <br />5. Update/revise 7 year Maintenance Program including the gravel road <br />elimination program (grep ). <br />6. Develop priority map identifying potential problems in case of lift station <br />failure. 2 of 6 complete (completion in 2006) <br />7. Continue to develop plan review checklist. <br />8. License appropriate Engineer staff for operating communal septic systems for <br />preparation of cluster housing opportunities. <br />9. Prioritize neighborhood connections for future CIP <br />10. Researchfeasibility of regional utilities (water treatment, waste water) <br />11. Complete storm water management plan for year 2007. <br /> <br />Streets Work Plan <br />1. Continue storm water inspection system and prioritize corrections as <br />necessary. <br />2. Continue street maintenance performance evaluation program for seal coating <br />and overlay projects utilizing the street rating program with engineering and <br />PW staff. <br />3. Final upgrades to metal building (floor drains) . <br />4. Continue educating residents on plowing process and staking policy. (On- <br />going) <br />5. Continue OSHAfMNDOT training in equipment operation. (On-going) <br />6. Generate estimate for hardware/software to produce signs in-house (2007 <br />budget proposal) <br />7. Formalize policy for private streets/walk/trail clearing. <br />8. Prioritize/document walk and trail maintenance service including hydrant <br />clearing. <br />9. Investigate feasibility of fueling station at Public Works. <br />10. Bondingfor infrastructure within Town Center. <br />11.. Complete mO'ling mailboxes from cui de sacs. (less than 30 remain) <br />12. Propose street/walk/trail maintenance needs ',vithin the RTC <br />13. Complete final year of 5 year plan to replace all City street signs with more <br />visiblc street signs. (will be completed in 2005) <br />14. Bring metal building up to year round use (siding and insulation). <br /> <br />6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.