My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 02/13/2007
Ramsey
>
Public
>
Agendas
>
Council
>
2007
>
Agenda - Council - 02/13/2007
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/19/2025 9:59:47 AM
Creation date
2/9/2007 3:07:06 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
02/13/2007
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
523
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
The streets scheduled for maintenance are illustrated in the Appendix C, the Preliminary <br />Assessment Role. This appendix also contains a listing of the parcels receiving benefit. All <br />streets proposed for the program have received a preliminary survey by the City Engineer and <br />Public Works Supervisor. A post winter survey will be conducted prior to awarding bids in May. <br />Appropriate project adjustments will be made if any of the scheduled projects are deemed to be <br />inappropriate for sealcoating due to advanced deterioration. <br />PROJECT QUANTITIES AND COSTS <br />Table 1 includes a listing of street lengths and pavement areas for each crack seal/sealcoat <br />project. Estimates -are also provided for crack filling material application rates. Table 2 contains <br />the estimated construction costs for each of these sealcoat projects. Both the sealcoating and <br />crack filling operation will be applied by a contractor selected through the competitive bidding <br />process. Previous program project costs along with the estimated 2007 unit prices for <br />sealcoating and crack filling are shown below which represents an increase of 15% over the bid <br />prices received for sealcoating and cracksealing in 2006.: <br />Material Material Construction <br />Bituminous overlay projects consist of applying one and one -half inch bituminous overlays onto <br />the existing pavement. Tables 3 and 4 present summaries of the project. quantities and <br />construction costs, respectively. Prior to the overlay, failed areas will be removed and patched by <br />the City's Public Works Department. The number of tons required for street patching is <br />estimated on an individual project basis. The rate charged for patching will be $200 per ton of <br />bituminous material which includes material and labor. The existing pavement will be tack <br />coated.and a machine laid one and one -half inch overlay will be placed by a contractor selected <br />through the competitive bidding process. Existing bituminous driveways will be feathered to <br />match the new pavement. Existing concrete driveways will have the adjoining street milled to <br />form a neat joint with the newly overlaid pavement. On streets without curbs, the edge of the <br />overlay street will be shouldered to eliminate the drop off at the pavement edge formed by the <br />overlay. The shouldering will be done a class 2 shouldering aggregate. Previous years low bid <br />and estimated 2007 unit prices for overlays are shown below. <br />Year <br />Bit Overlay <br />Crack <br />Year <br />Sealcoat <br />Fill <br />Project Cost <br />$3.34 <br />$ /SgYd <br />$ /Lb <br />$ /SgYd <br />2003 <br />$0.63 <br />$1.00 <br />$0.70 <br />2004 <br />$0.49 <br />$1.02 <br />$0.74 <br />2005 <br />$0.54 <br />$1.28 <br />$0.73 <br />2006 <br />$0.63 <br />$1.30 <br />$0.76 <br />2007 est. <br />$0.72 <br />$1.50 <br />$0.87 <br />Bituminous overlay projects consist of applying one and one -half inch bituminous overlays onto <br />the existing pavement. Tables 3 and 4 present summaries of the project. quantities and <br />construction costs, respectively. Prior to the overlay, failed areas will be removed and patched by <br />the City's Public Works Department. The number of tons required for street patching is <br />estimated on an individual project basis. The rate charged for patching will be $200 per ton of <br />bituminous material which includes material and labor. The existing pavement will be tack <br />coated.and a machine laid one and one -half inch overlay will be placed by a contractor selected <br />through the competitive bidding process. Existing bituminous driveways will be feathered to <br />match the new pavement. Existing concrete driveways will have the adjoining street milled to <br />form a neat joint with the newly overlaid pavement. On streets without curbs, the edge of the <br />overlay street will be shouldered to eliminate the drop off at the pavement edge formed by the <br />overlay. The shouldering will be done a class 2 shouldering aggregate. Previous years low bid <br />and estimated 2007 unit prices for overlays are shown below. <br />Year <br />Bit Overlay <br />Project Cost <br />$ /Ton <br />$ /SgYd <br />2003 <br />$27.00 <br />$3.34 <br />2004 <br />$28.03 <br />$2.67 <br />2005 <br />$29.19 <br />$3.46 <br />2006 <br />$47.23 <br />$4.25 <br />2007 est. <br />$59.04 <br />$5.31 <br />• <br />1�1 <br />Ina <br />
The URL can be used to link to this page
Your browser does not support the video tag.