Laserfiche WebLink
5. IP 27-06 Windemere Woods 1st & 2"d Street Reconstructions <br />a. Subdivision is generally located north of Bunker Lake Boulevard (CSAH 116) adjacent to Magnesium <br />Street <br />i. Streets are 0.75 miles in total length <br />1. 31-feet wide urban section <br />2. Municipal utilities exist within the project area <br />ii. Scope of work includes: <br />1. Twelve (12) Soil Borings to a depth of 15-feet <br />2. Twelve (12) Pavement Cores <br />iii. A standard geotechnical report including construction feasibility for public utilities and pavement <br />section <br />1. Streets require a 7-ton pavement design <br />a. Typically, City would do an FDR or full reconstruction <br />2. Logs of soil borings with descriptions of nomenclature used for defining the site soils <br />3. Estimated subgrade support strength parameters for design of the bituminous roadway and <br />recommendations for soil corrections; Design R-Value estimate <br />4. Recommendations for earthwork associated with installation of storm sewer pipes and <br />structures <br />5. Recommendations for management of groundwater for design of structures and pavements <br />SOIL BORING REQUIREMENTS: Soil borings to a depth called out above will be taken at stationing shown <br />on the attached "Boring Hole Location" exhibits. Soil borings will alternate between drive lanes as practical. <br />Cores of the existing bituminous pavement will be required. Cores will be taken to verify thickness and structural <br />integrity of the existing pavement and base. Pictures of the cores will be included in the final report. Any <br />additional depth beyond depth called out will be paid per lineal foot. The Contractor must perform sufficient <br />survey work to locate holes approximately 5 feet horizontally and approximately 0.5 feet vertically. The <br />Contractor is responsible for locating all utilities prior to starting boring operations. <br />SOIL BORING LOG REQUIREMENTS: A field boring log will be prepared by the Contractor for each boring <br />with a copy included in the final report. The field boring logs will include; <br />• The project identification number <br />• Location of the boring referenced by centerline stationing <br />• Boring log number <br />• Method of drilling and sampling, diameter of bore hole <br />• Date, name of driller and crew <br />• Ground surface elevation and ground water elevation measured to the nearest 0.5 feet <br />• Definition of all symbols that are not otherwise self-explanatory <br />• Classification, thickness, color, moisture condition (dry, moist, wet, saturated), composition and degree <br />of compactness <br />• Field number of any samples taken, type of sample and depth taken <br />• Depth at which obstacles were encountered in advancing the boring <br />• Any other unusual conditions encountered during drilling and sampling <br />4 <br />