My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 05/26/2026
Ramsey
>
Public
>
Agendas
>
Council
>
2026
>
Agenda - Council - 05/26/2026
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/27/2026 2:51:37 PM
Creation date
5/27/2026 8:48:56 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
05/26/2026
Supplemental fields
Year
%(Da
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
599
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CC Regular Session <br />Meeting Date: <br />05/26/2026 <br />Primary Strategic Plan Initiative: Address infrastructure needs. <br />5. 6. <br />Title: <br />Adopt Resolution #26-125 Approving Final Plans and Specifications and Authorizing Advertisement for Bids for <br />Riverside West Street Reconstructions, Improvement Project #26-06 <br />Purpose/Background: <br />Purpose: <br />The purpose of this case is to adopt Resolution #26-125 approving final plans and specifications and authorizing <br />advertisement for bids for Riverside West Street Reconstructions, Improvement Project #26-06. <br />Background: <br />The 2026 — 2035 Capital Improvement Plan (CIP) identifies the streets within the Riverside West subdivision for <br />street reconstruction in 2026. A street segment summary for the project is attached to this case. <br />Project History <br />• On April 22, 2025, the Ramsey City Council adopted Resolution #25-082, accepting and awarding a <br />proposal to Bolton & Menk for topographic survey of the project area. <br />• May 13, 2025, the Ramsey City Council adopted Resolution #25-101, accepting and awarding a proposal <br />to Independent Testing Technologies for a geotechnical report of the project area. <br />• June 17, 2025, the Ramsey Public Works Committee recommended City Council order plans and <br />specifications for said improvements. <br />• June 24, 2025, the Ramsey City Council adopted Resolution #25-140, ordering plans and specifications <br />for said improvements. <br />• April 22, 2026, staff held a public open house for said improvements. <br />• May 19, 2026, the Ramsey Public Works Committee recommended City Council approve final plans and <br />specifications and authorize advertisement for bids for said improvements. <br />Project Scope <br />This project proposes to reconstruct 137th Avenue and Dolomite Street within the Riverside West subdivision. <br />Additionally, the project proposes to mill and overlay Ebony Street, which is located in this same subdivision but <br />constructed 13 years after the original streets. This project is generally located between Riverdale Drive and the <br />Mississippi River, on the previously mentioned cross streets. <br />Existing Pavement Conditions <br />137th Avenue and Dolomite Street were constructed in 1992. Pavement maintenance has included crack seal / <br />seal coat improvements in 2003 and 2011, as well as skim patching in 2024. The skim patching has held up well. <br />Ebony Street was constructed in 2005. Pavement maintenance has included crack seal / seal coat improvements in <br />2011 and crack seal improvements in 2021. The streets are 31-foot-wide urban section with surmountable <br />concrete curb and gutter, totaling 0.48 miles in length. Sidewalk exist along Ebony Street, but not 137th Avenue <br />and Dolomite Street. There is a trail crossing on 137th Avenue which leads to Riverdale Park. Anoka County <br />reconstructed this trail south of 137th Avenue in 2025, including updating the pedestrian ramp. The ramp on the <br />north side of 137th Avenue was not reconstructed, and is not up to current ADA standards. Municipal water and <br />sewer, as well as storm sewer exist in the project area. The storm sewer outlets to the Mississippi River from <br />137th Avenue at the intersections with both Ebony and Dolomite Street. The Ebony Street outlet already has a <br />hydro -dynamic separator structure, similar to what has been retro-fit on recent projects including the Dickenson's <br />
The URL can be used to link to this page
Your browser does not support the video tag.