My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 05/26/2026
Ramsey
>
Public
>
Agendas
>
Council
>
2026
>
Agenda - Council - 05/26/2026
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/27/2026 2:51:37 PM
Creation date
5/27/2026 8:48:56 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
05/26/2026
Supplemental fields
Year
%(Da
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
599
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mississippi Estates Reconstruction and the Bowers Drive Overlay Improvements. Because a sanitary sewer lift <br />station is adjacent to the storm sewer at the intersection of Dolomite Street, there is not enough space to retro-fit a <br />structure near the roadway for this second, smaller outlet. <br />Proposed Improvements <br />This project is proposed to be a full -depth reclamation (FDR) on 137th Avenue and Dolomite Street, which <br />includes grinding up the existing bituminous and aggregate base, hauling off excess material, and placing new <br />bituminous pavement. The existing pavement section is sufficient to allow for 3.5-inches of new bituminous <br />pavement over 5-inches of aggregate base, which will be made of the recycled reclamation material. Spot <br />concrete curb and gutter replacements will occur, which will require spot driveway end replacements. The <br />majority of the concrete curb and gutter and driveways will remain in -place. The utilities were tested during <br />design, no repairs were found to be necessary in the reconstruction area. Catch basins will be adjusted and/or <br />grouted as part of the project, but no additional structures or full replacements will be necessary. <br />Ebony Street will receive a 2-inch mill and overlay as part of this project. Ebony Street was originally included in <br />the 2026 Neighborhood Overlay project, but moved to this project due to project location. Staff anticipates this <br />will result in an overall cost savings for the city by reducing mobilization costs. Utility testing did find 1 length of <br />storm sewer pipe which will require replacement as part of the project. <br />The project will include pedestrian ramp improvements at the intersection of Ebony Street and 137th Avenue, as <br />well to the trail crossing on the north side of 137th Avenue. This improvements will bring the pedestrian ramps up <br />to current ADA standard. <br />Restoration of the impacted boulevards will include a minimum of 4-inches topsoil and hydroseed with a <br />residential turf seed mix. <br />Preliminary Schedule Remaining <br />• Council approves plans and specifications / authorizes ad for bids <br />o May 26, 2026 <br />• Staff Receives Bids <br />o July 7, 2026 <br />• Council Awards Contract to the Lowest Responsible Bidder <br />o July 14, 2026 <br />• Contractor Begins Construction <br />o Late Summer 2026 <br />o Detailed construction schedule will not be known until project is awarded and pre -construction <br />meeting is held with the contractor <br />• Contractor Substantially Completes Construction <br />o New bituminous pavement in -place, topsoil and seed in -place <br />o October 2, 2026 <br />• Contractor Final Completion <br />o Verify final restoration; punch list created <br />o October 31, 2026 (may extend into spring of 2027) <br />Final plans are not attached to this case to prevent potential bidders from downloading plans attached to the case <br />to prepare and submit their bids, rather than purchasing the plans through QuestCDN, the electronic bidding <br />software used by the City of Ramsey. This ensures all bidders are bidding off the same set of plans, and all <br />bidders are notified of any plan revisions (addenda) issued during the bidding process. Attached is the title sheet <br />showing the scope of the improvements, as well as a plan sheet showing the typical section, which includes <br />information on the proposed pavement section. Plans are available upon request from the City Engineer. <br />Notification: <br />
The URL can be used to link to this page
Your browser does not support the video tag.