My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Planning Commission - 06/05/2003
Ramsey
>
Public
>
Agendas
>
Planning Commission
>
2003
>
Agenda - Planning Commission - 06/05/2003
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/21/2025 9:31:06 AM
Creation date
6/4/2003 9:57:14 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Planning Commission
Document Date
06/05/2003
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
523
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
There is also some concern that increased pumping in the FIG aquifer could impact private wells <br />that pump from this aquifer. Again, the residual drawdown levels in the FIG average 5- to 1 O-feet <br />during the peak summer pumping period (Appendix F) and recover fully during the Fall, Winter <br />and Spring. Therefore, the radius of influence of the wells will be very small meaning there could <br />be no impacts to private wells developed in the same unit. <br /> <br />Before additional wells are constructed, additional appropriations will be applied for through the <br />DNR. This will most likely require both short- and long-term testing and monitoring to verify the <br />above findings. Thrpugh this process, the City can insure that there continue to be no impacts on <br />groundwater and surface resources due to their appropriations from the FIG. <br /> <br />242 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.