Laserfiche WebLink
'i. <br /> <br />on the access roads will have sufficient distance of public roads in view so <br />that any turns onto the public road can be completed with a margin of <br />safe~ as determined by the City. Engineer. <br /> <br />All access roads from grading, mining or filling operations to public <br />highways, roads or streets shall be maintained in order to minimize dust <br />considerations. <br /> <br />Fill Materials. An analysis of all fill materials must be provided'to and <br />approved by the City Engineer prior to commencing any fflIing activities. <br />No filling materials shall be permitted which in the opinion 'of the City <br />Engineer would be undevelopable or create substandard soils. <br /> <br />Screening Barrier. To minimize problems of dust and no[se and to shield <br />operations from public view, a screening barrier ,nay be required between <br />the work site and adjacent properties. A .screening'barrier may also be <br />required between the work site and-any public roads located within 500 <br />feet of any grading, mining or filling operations. The screening barrier <br />shall be planted with a species of fast growing trees, and where practical, <br />stockpiles of overburden materials shall be used to screen the operation <br />work site. <br /> <br />Slopes. The maximum permitted slope for any grading, mining or filling <br />operation other than the working face shall be sloped on-all sides at a <br />maximum ratio of two (2) foot horizontal to one (1) foot vertical, unless a <br />steeper slope shall be approved by the Engineer. In no case shall the slope <br />of the working face of the operation be left unattended with a slope greater <br />than two feet horizontal to one (1) foot vertical. <br /> <br />Where excavations are adjacent to a public roadway or other right- <br />of-way, the excavation shall have a maximum four (4'~ to one ~ <br />slope. Slopes adjacent, to or contiguous to bodies of water shall be <br />sloped at a maximum of si.': five (55 to one (13(6:l). <br /> <br />Setback Grading; mining or filling operation shall not be conducted <br />closer than thirty (30) feet to the r/ght-of-way fine of any existing or platted <br />street, road or highway, except that excavating may be conducted within <br />such limits in order to reduce or raise the elevation thereof in confonnity to <br />the existing or platted street, road or highway. <br /> <br />Security Agreement. Prior to commencing any grading mining or filling <br />operations, a performance bond,~ cash escrow or irrevocable letter of credit, <br />in such form and amounts as the City may require, shall be deposited with <br />the City. The amount of this deposit shall vary according to the scope and <br />duration of the project and shall be established by the Council This <br />deposit may be used by the City to: .Pay for the cost and expense of <br />repairing any public right-of-ways due to the grading, mining or filling <br />operation; pay for any casts associated in administering the requirements of <br />this Chapter of the City Code; and to pay for m~y restoration of the work <br />site not properly restored upon completion. This security shall be used by <br /> <br /> P~,,o ....... Standards 9-78 Jan. ~02 DrmCt 73 <br />9:li ~-~'~ ........ <br /> <br /> <br />