My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Planning Commission - 05/01/2003
Ramsey
>
Public
>
Agendas
>
Planning Commission
>
2003
>
Agenda - Planning Commission - 05/01/2003
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/21/2025 9:30:47 AM
Creation date
6/4/2003 10:28:49 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Planning Commission
Document Date
05/01/2003
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
395
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
302 <br /> <br />so <br /> <br />24. <br /> <br />The permittee must properly complete the agency operational <br />report form and submit it monthly to the agency and to the <br />Administrator, whether or not the permitted facility is yet <br />constructed or whether or not it is in operation. <br /> <br />25. <br /> <br />Within one (1) month after final termination of a site, or a <br />major part thereof, the area must be covered with at least two <br />(2) feet of compacted earth material, graded to a minimum two <br />percent (2%) slope to promote surface water runoff without <br />excessive erosion. <br /> <br />The finished surface of the filled area must be covered and <br />maintained with adequate top soil and seeded to provide <br />suitable vegetation immediately upon completion, or <br />immediately in the spring on areas te~Tninated during winter <br />conditions. If necessary, seeded slopes must be covered with <br />straw or similar material to prevent erosion. <br /> <br />Prior to completion of an industriaI solid waste land disposal <br />facility, the City must be notified in order that a site <br />investigation may be conducted by the City before earth <br />moving equipment is removed from the property. <br /> <br />After completion of an industrial solid waste land disposal <br />facility, a detailed description, including a plat, must be <br />recorded with the county recorder. The description must <br />include general'types and location of wastes, depth of fill, and <br />other information of interest to future land owners. <br /> <br />If the completed site is to be cultivated, the integrity of the <br />finished surface must not be disturbed by agricultural <br />cultivation activities. If cultivated, a sufficient depth of cover <br />material to allow cultivation and to support vegetation must be <br />maintained. <br /> <br />Prohibited Locations for Construction and Operation of Solid <br />Waste Management Facilities. An owner or operator may not <br />establish or construct a solid waste management facility in the <br />following areas: <br /> <br />1. Within a floodplain. <br /> <br />2. Within a shoreland area governed by Chapters 6105 and 6120. <br /> <br />3. Within a wetland. <br /> <br />9-127 <br /> <br />!, <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.