bituminous and 2.5-inches of aggregate base. <br />No stormwater improvements, other than replacing existing street crossing culverts, are proposed with this <br />project. As part of the PACT Charter High School development, residents on 163rd Lane had concerns about <br />runoff from the High School overflowing the wetland in their rear yard, adjacent to the High School. The High <br />School development has not been found to have a negative impact to this wetland, which during heavy rainfall <br />events causes water to temporarily sit in the southern ditch of 163rd Lane. The water does not appear to stay in the <br />ditch more than 48 hours and is maintainable in its current condition. <br />Proiect Scone <br />The reconstruction is proposed to be a Full -depth Reclamation (FDR). This generally includes reclamation of the <br />existing bituminous pavement and underlying aggregate base; flipping the reclaim, hauling out excess sand <br />subbase material and scarifying the subbase; hauling off excess reclamation material (minimal due to hauling out <br />subbase material); shaping and compacting the remaining reclamation material to be used as the new aggregate <br />base; placing new bituminous pavement in two lifts. The road profile and alignment generally stay in the same <br />location, with some minor corrections to curves occurring, but does typically impact 6 to 8 feet of adjacent <br />boulevard and driveways. <br />Three (3) of the eighteen (18) soil borings found silty sand. Though it's generally understood proper conditions <br />can make use of this material as road subbase, previous projects with similar material have required removal and <br />replacement after the material failed; after removal of the bituminous under the load of construction equipment. <br />Because of this, and the marginal soil borings not being all grouped together, the plans include a contingency <br />quantity for soil corrections, but no specific removals are called out in the plans. <br />Staff explored performing a reclamation rehabilitation, however, the subbase material is not high enough quality <br />for this to be effective. The new pavement section will include 6-inches of recycled reclamation material under <br />3.5-inches of new bituminous. <br />Municipal utilities do not exist within the project area, extension of municipal utilities to this subdivision are not <br />proposed as it is outside of the 2040 MUSA. <br />Preliminary Schedule Remaininw <br />• Council Awards Contract to the Lowest Responsible Bidder <br />o June 23, 2026 <br />• Contractor Begins Construction <br />o Alter July 1, 2026 <br />• Contractor Substantially Completes Construction <br />o New bituminous pavement in -place, topsoil and seed in -place <br />o September 4, 2026 <br />• Contractor Final Completion <br />o Verify final restoration; punch list created <br />o October 2, 2026 <br />The full plan set was not attached to this case due to file size constraints, however, plans are available for review <br />upon request from the City Engineer. <br />Notification: <br />If City Council awards a contract for construction, letters will be mailed to property owners with updates on the <br />project status. Engineering staff maintains City Improvement webpages with the most current project information. <br />This can be found on the city website, Engineering Department page. <br />Time Frame/Observations/Alternatives: <br />