My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Planning Commission - 05/02/2002
Ramsey
>
Public
>
Agendas
>
Planning Commission
>
2002
>
Agenda - Planning Commission - 05/02/2002
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/21/2025 9:28:33 AM
Creation date
6/4/2003 12:12:00 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Planning Commission
Document Date
05/02/2002
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
255
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
188 <br /> <br /> A Landscape Plan has been submitted that is generally acceptable and meets the City's minimum <br /> standards. City Staff will continue to review the plan and make comments regarding the plan at a <br /> future date. <br /> <br />'The City has engaged the services Of SKF to do a traffic noise level study on several pending <br />residential proposals along T.H. fl47. A 10-foot sound wail or a combination of berming and <br />sound wall must be completed as part of this development. . <br /> <br />Limited information has been provided regarding the building plans. The City has received floor <br />plans and elevations for the 4-uit buildings. The 4-unit buildings will be vinyl siding with brick <br />accents on the front elevation. Each unit will be at least 889 square feet in size. Lfthe lower level <br />of the units are finished, a there will be a total of 1,523 square feet of finished area in each area. <br />The proposed sizes for the 4-units meet the minimums prescribed in City Code. AJthough it <br />appears that the proposed two-unit buildings will meet. minimum standards, staff will need to <br />verify that the units do. The applicant will be providing this additional irLformation. <br /> <br />Recommendation: <br /> <br />Staff recommends Site Plan approval contingent upon compliance with Staff Review Letter dated <br />April 26, 2002, the applicant obtaining a variance for the front yard setback requirements, and <br />subdivision approval. <br />Commission Action: 4~'"~ "~"~]" b <br />Motion to recommend that the City Council approve/deny the proposed site plan for Evergreen <br />Point contingent upon compliance with City Staff Review Letter dated April 26, 2002, the <br />applicant obtaining a variance to the front yard setback requirements, and subdivision approval. <br /> <br />Review Checklist: <br />Community Development Director <br />Associate Planner <br />Principal City Engineer <br />Parks & Utilities Supervisor <br /> <br />PC: 05/04/02 <br /> <br />I <br />I <br />I <br />I <br />I <br /> <br />I <br />I <br />I <br /> <br />I <br />I <br />I <br />I <br />I <br />I <br />i <br />I <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.