Laserfiche WebLink
CONSIDER REGIONAL WATER IMPROVEMENT STUDY <br />• By:Leonard Linton, Civil Engineer II <br />Background: <br />CASE # 5 <br />The City is currently conducting a pilot plant study to determine the feasibility of using surface <br />water to supply the water needs as demand increases. Utilization of surface water will require <br />construction of a water treatment plant which is a large capital. expenditure. Staff and Bolton & <br />Menk, Inc. reviewed water supply options with the City Council at the January 30, 2007 work <br />session. Discussion included exploring options to make the treatment plant a regional resource, <br />thereby spreading the cost of the investment. A regional plant may be eligible for grants to help <br />offset the cost whereas a city plant is not eligible for grants. <br />Staff has requested a proposal from Bolton & Menk, Inc. for evaluating the potential for a regional <br />water treatment plant in Ramsey to serve the needs of Ramsey and St. Francis. They have <br />submitted a proposal for performing this analysis, the proposal has 2 phases. Phase 1 consists of a <br />kickoff meeting, gathering information and identifying potential solutions. Phase 2 consists of <br />compiling the data from Phase 1, identifying the necessary infrastructure and schedule and preparing <br />a -report with a presentation to the City Council. Bolton & Menk, Inc. has a working relationship <br />with the City of St. Francis also so coordination of meetings and gathering of data should proceed <br />smoothly. A copy of the proposal is attached to the case. <br />The proposed schedule is to complete Phase 1 two (2) weeks after authorization to proceed and <br />• Phase 2 four (4) weeks after Phase 1 is completed. The schedule can be adjusted to accommodate <br />Council and staff needs. <br />The proposed compensation for Phase 1 is a lump sum of $5,000 and Phase 2 is a lump sum of <br />$12,500. <br />Funding Source: <br />This study will be funded from the Water Utility. <br />Staff Recommendation: <br />Staff recommends approval of the proposal from Bolton & Menk, Inc for study of regional water <br />improvements in 2 phases, with compensation for Phase 1 as a lump sum of $5,000 and Phase 2 as a <br />lump sum of $12,500. <br />Council Action: <br />Motion for approval of the proposal from Bolton & Menk, Inc for study of regional water <br />improvements in 2 phases, with compensation for Phase 1 as a lump sum of $5,000 and Phase 2 as a <br />lump sum of $12,500. <br />• Reviewed by: <br />Interim City Administrator <br />Director of Public Works/ Principal City Engineer. <br />CC: . 2/27/07 <br />—155— <br />