This project is proposed to be a full -depth reclamation (FDR) on 137th Avenue and Dolomite Street, which includes grinding <br />up the existing bituminous and aggregate base, hauling off excess material, and placing new bituminous pavement. The <br />existing pavement section is sufficient to allow for 3.5-inches of new bituminous pavement over 5-inches of aggregate base, <br />which will be made of the recycled reclamation material. Spot concrete curb and gutter replacements will occur, which will <br />require spot driveway end replacements. The majority of the concrete curb and gutter and driveways will remain in -place. <br />The utilities were tested during design, no repairs were found to be necessary in the reconstruction area. Catch basins will be <br />adjusted and/or grouted as part of the project, but no additional structures or full replacements will be necessary. <br />Ebony Street will receive a 2-inch mill and overlay as part of this project. Ebony Street was originally included in the 2026 <br />Neighborhood Overlay project, but moved to this project due to project location. Staff anticipates this will result in an overall <br />cost savings for the city by reducing mobilization costs. Utility testing did find one length of storm sewer pipe which will <br />require replacement as part of the project. <br />The project will include pedestrian ramp improvements at the intersection of Ebony Street and 137th Avenue, as well to the <br />trail crossing on the north side of 137th Avenue. These improvements will bring the pedestrian ramps up to current ADA <br />standard. <br />Restoration of the impacted boulevards will include a minimum of 4-inches topsoil and hydroseed with a residential turf seed <br />mix. <br />Preliminary Schedule Remaininc <br />• Council Awards Contract to the Lowest Responsible Bidder <br />o July 14, 2026 <br />• Contractor Begins Construction <br />o Late Summer 2026 <br />o Detailed construction schedule will not be known until project is awarded and pre -construction meeting is held <br />with the contractor <br />• Contractor Substantially Completes Construction <br />O New bituminous pavement in -place, topsoil and seed in -place <br />O October 2, 2026 <br />• Contractor Final Completion <br />O Verify final restoration; punch list created <br />O October 31, 2026 (may extend into spring of 2027) <br />Notification: <br />If City Council awards a contract for construction, letters will be mailed to property owners with updates on the project <br />status. Engineering staff maintains City Improvement webpages with the most current project information. This can be found <br />on the city website, Engineering Department page. <br />Time Frame/Observations/Alternatives: <br />Timeframe: <br />Staff estimates up to 10 minutes will be required to present this case and answer questions. <br />Alternatives: <br />Alternative #1 — Motion to adopt Resolution #26-161 accepting bids and awarding a contract to North Valley, Inc. for the <br />total amount of $327,246.47 for Riverside West Street Reconstructions, Improvement Project #26-06. <br />Alternative #2 — Motion of other. <br />Funding Source: <br />Funding for this improvement is proposed to come from Pavement Management Funds and Storm Water Utility Funds. <br />On July 7, 2026 a total of four (4) bids were received, opened, and tabulated, and the following bids were found to comply <br />with the advertisement for bids. <br />(Contractor Total Bid <br />North Valley, Inc. $327,246.47 <br />Park Construction Company $353,438.10 <br />(Asphalt Surface Technology Corp. $354,255.45 <br />1GMH Asphalt Corporation $364,691.90 <br />