Laserfiche WebLink
this intersection in the near future. The current Comprehensive Plan includes a trunk watermain loop connection between <br />these two points. Staff recommends making the trunk watermain loop connection at a later date, when development along <br />175th Avenue drives it, since the construction would likely be directional drilling and would not have significant cost savings <br />combining it with an overlay improvement. <br />Additional Permittine <br />Staff has been working with the Lower Rum River WMO to obtain a permit for wetland filling associated with the <br />improvements to 173rdAvenue between Puma Street and Iguana Street. Anoka County Highway Department (ACHD) <br />permits will be required for the connections at both Armstrong Boulevard and Nowthen Boulevard. An ACHD permit will <br />also be required for replacing the Ditch 51 culvert. These permit processes have all started and staff does not anticipate any <br />impacts to the project timeline. To use Municipal State Aid funding for this project, a MnDOT MSA approval is also <br />required. Staff has submitted the plans to the MnDOT MSA office for review, and does not anticipate major revisions. The <br />MSA approval is required prior to opening bids for this project. <br />Preliminary Schedule Remainine <br />• Council approves plans and specifications / authorizes ad for bids <br />o July 14, 2026 <br />• Council awards contract to the lowest responsible bidder <br />o August 25, 2026 <br />• Contractor begins construction <br />O September 2026 <br />• Contractor substantially completes phase 1 <br />o October 16, 2026 <br />o Completes mill and overlay (entire project area except between Puma Street and Iguana Street) <br />o Replaces Ditch 51 culvert <br />o First lift new pavement between Puma Street and Iguana Street <br />o Temporary restoration in -place <br />• Contractor substantially completes phase 2 <br />o May 31, 2027 <br />o Final lift of new pavement between Puma Street and Iguana Street <br />o Final restoration in -place <br />O Create final punch list <br />• Contractor final completion <br />o June 30, 2027 <br />o Verify final restoration; punch list complete <br />Final plans are not attached to this case to prevent potential bidders from downloading plans attached to the case to prepare <br />and submit their bids, rather than purchasing the plans through QuestCDN, the electronic bidding software used by the City <br />of Ramsey. This ensures all bidders are bidding off the same set of plans, and all bidders are notified of any plan revisions <br />(addenda) issued during the bidding process. Attached is the title sheet showing the scope of the improvements, as well as a <br />plan sheet showing the typical sections, which includes information on the proposed pavement section. Plans are available <br />upon request from the City Engineer. <br />Notification: <br />If City Council approves plans and specifications and authorizes advertising for bids, bids will be advertised on Friday, July <br />17, and again on Friday, July 24, 2026, in the City's official newspaper, the Anoka Union Herald. Plans are also advertised <br />on the QuestCDN website, which directly notifies contractors interested in bidding these types of projects. <br />Additionally, letters will be mailed to property owners with updates on the project status. <br />Time Frame/Observations/Alternatives: <br />Observations: <br />Due to replacing the Ditch 51 culvert and other associated work, 173rd Avenue will be fully closed for approximately 4 to 6 <br />weeks between Puma Street and iguana Street. A signed detour route will be set up as part of the project. <br />Alternatives: <br />Motion to adopt Resolution #26-160 approving plans and specifications and authoring advertisement for bids for 2026 MSA <br />Pavement Overlay Improvements, Improvement Project #26-02. <br />Funding Source: <br />