My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 07/28/2026
Ramsey
>
Public
>
Agendas
>
Council
>
2026
>
Agenda - Council - 07/28/2026
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/5/2026 3:04:29 PM
Creation date
7/28/2026 9:13:52 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
07/28/2026
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
323
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
7. 5. <br />CC Regular Session <br />Meeting Date: <br />07/28/2026 <br />Primary Strategic Plan Initiative: Improve the safety and mobility of transportation corridors. <br />Title: <br />Adopt Resolution #26-163 Approving Plans and Agreements with Connexus Energy for COR Street Lighting Improvements, <br />Improvement Project #25-12. <br />Purpose/Background: <br />Purpose: <br />The purpose of this case is to adopt Resolution #26-163 approving Plans and Agreements with Connexus Energy for COR <br />Street Lighting Improvements, Improvement Project #25-12. <br />Background: <br />The plans provided by Connexus Energy include a total of 47 street lights that are 25-feet tall, and 16 pedestrian facility <br />lights that are 14-feet tall. The proposed design primarily provides street lights at intersections to improve safety for <br />motorists and pedestrians navigating intersections, as well as at mid -block pedestrian crosswalks. A more robust lighting <br />plan is proposed along Ramsey Parkway due to the presence of on -street parking, pedestrian facilities along both sides of the <br />parkway, and recreational opportunities, including the new Waterfront Waterplay Park. <br />Attached is a copy of the final plans showing all proposed lighting for The COR. Copies of the required construction and <br />maintenance agreements requiring execution by the city are also attached. <br />If approved, Connexus Energy's contractor will install underground lighting improvements in 2026. The above ground work <br />(poles and fixtures) will follow as soon as these materials are delivered, which is anticipated to take 6 months or more. <br />However, Connexus is checking to see if they can receive some poles and fixtures this Fall to allow lighting to be installed at <br />some of the more critical intersections in 2026 including Zeolite Street and Ramsey parkway, as well as intersections along <br />Bunker Lake Boulevard. <br />The City of Ramsey works exclusively with Connexus Energy to design, construct and maintain street and trail lighting <br />improvements throughout the City. <br />Notification: <br />None are required for this case. <br />Time Frame/Observations/Alternatives: <br />Observations: <br />Attached is a copy of the April 15, 2025, Public Works Committee meeting agenda case with attachments that includes <br />additional background information on the design of The COR Street Lighting Improvements project. <br />Alternatives: <br />Alternative #1 — Motion to adopt Resolution #26-163 approving Plans and Agreements with Connexus Energy for The COR <br />Street Lighting Improvements, Improvement Project #25-12. <br />Alternative #2 — Motion of other. <br />Funding Source: <br />Attached is page 291 from the 2026-2035 Capital Improvement Plan showing the original estimated cost for The COR Street <br />Lighting Improvements at $475,000. The attached construction agreement from Connexus estimates final construction costs <br />for the proposed COR Street Lighting Improvements at $493,976.50. <br />Funding for these street lighting improvements is proposed to be paid from the Street Lighting Fund, which has a current <br />balance in excess of $1.6 million Adequate funds are therefore available to construct this project, as well as the other <br />proposed 2026 street lighting improvements estimated to cost $525,000, though the plans for this project are not yet under <br />development so a final estimated cost is not yet known. <br />
The URL can be used to link to this page
Your browser does not support the video tag.