Laserfiche WebLink
THE IMPACT OF RESPONSIBLE BIDDER ORDINANCES ON UNION CONTRACTORS IN ILLINOIS AND INDIANA <br />However, it is important to note that the market share of union contractors in the 14 northern Indiana <br />counties and 25 northern Illinois counties also increased during the period of analysis. Figure 3 <br />investigates the entire region except for the 11 jurisdictions that passed new RBOs and had before -and - <br />after data. This provides a "control group" of public projects to compare with the "treatment group" of <br />local projects that experienced the RBO policy change. In 2018, before these 11 RBOs were passed, union <br />contractors were awarded 96.9 percent of the entire market. In the years that have followed, union <br />contractors won 98.4 percent of the market share. <br />FIGURE 3: OVERALL CHANGE IN UNION MARKET SHARE IN 25 NORTHERN ILLINOIS COUNTIES AND 14 NORTHERN INDIANA <br />COUNTIES, EXCLUDING THE 11 JURISDICTIONS THAT PASSED RBOS, DATA FROM JAN. 2018 THROUGH JUNE 2021 <br />Illinois and Indiana Market <br />(Excluding 11 Areas that Passed RBOs) <br />Total Union Nonunion Union <br />Value Value Value Market Share <br />Pre-RBO (Jan. 2018-Dec. 2018) <br />Post-RBO (Jan. 2019-June 2021) <br />Difference <br />Source: Authors' analysis of project bid data from the Indiana, Illinois, Iowa Foundation for Fair Contracting <br />$4,771,472,168 $4,622,849,093 $146,841,457 <br />$15,171,633,497 $14,931,653,208 $220,619,613 <br />96.9% <br />98.4% <br />+1.5 % <br />The region has thus experienced a 1.5 percent increase in union market share in areas that did not <br />otherwise change during this time (Figure 3). There are two implications of this finding. The first is that <br />union contractors have become more competitive compared with their nonunion counterparts in the <br />region since 2018. The second is that the market share of union contractors would have been expected <br />to increase by an average of 1.5 percent in the 11 jurisdictions that passed RBOs even if they had not <br />enacted the new ordinances. In other words, there is no reason to think that these 11 jurisdictions would <br />deviate significantly from the rest of the regional construction market. <br />Figure 4 calculates how much RBOs increased the market share of union contractors above -and -beyond <br />the general trend in the market. The net effect of RBOs on the union market share can be determined by <br />subtracting the 1.5 percent overall gain in union market share across the region from the 10.8 percent <br />gain in union market share on post-RBO projects relative to pre-RBO projects in the jurisdictions that <br />passed the ordinances. Consequently, the 11 new responsible bidder ordinances in Illinois and Indiana <br />since 2019 have boosted the market share of union contractors by an estimated 9.3 percent (Figure 4). <br />FIGURE 4: NET CHANGE IN UNION WIN SHARE AND UNION MARKET SHARE BASED ON THE DIFFERENCE -IN -DIFFERENCES <br />IN THE 11 JURISDICTIONS THAT PASSED RBOS, WITH BEFORE -AND -AFTER DATA FROM JAN. 2018 THROUGH JUNE 2021 <br />Net Impact of New RBOs <br />in Illinois and Indiana <br />Pre-RBO Post-RBO RBO <br />Period Period Difference <br />11 Jurisdictions with New RBOs <br />Illinois and Indiana (Excluding 11 Jurisdictions) <br />Difference <br />87.1% <br />96.9% <br />-9.8% <br />97.9% <br />98.4% <br />-0.5% <br />Source: Authors' analysis of project bid data from the Indiana, Illinois, Iowa Foundation for Fair Contracting <br />This increase in the union market share mirrors the results of a 2020 study using similar data for northern <br />Indiana and northern Illinois but excluding projects from the Chicago metropolitan area. That study <br />compared projects that were covered by RBOs verses projects that were not and found that the RBOs <br />increase union contractor win rates by between 9.2 percent and 11.9 percent, after accounting for the <br />size of the project, location of the project, and other factors (Manzo, 2020). The current analysis builds <br />upon that 2020 study by using the before -and -after "natural experiment" to directly assess the impact of <br />enacting a responsible bidder ordinance. <br />5 <br />