My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council Work Session - 07/28/2026
Ramsey
>
Public
>
Agendas
>
Council Work Session
>
2026
>
Agenda - Council Work Session - 07/28/2026
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/5/2026 3:15:11 PM
Creation date
7/28/2026 9:26:38 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council Work Session
Document Date
07/28/2026
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
222
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
December 31st for the upcoming calendar year. Failure by any pre -qualified bidder or <br />subcontractor to timely submit its complete application for continuation of pre -qualified <br />standing shall result in automatic removal of the designation effective January 1 of the <br />upcoming year. However, the removed bidder or subcontractor shall still be permitted to bid <br />on or perform work on public works projects. <br />Any material changes to a contractor's status, at any time, must be reported in writing within <br />ten (10) days of its occurrence to the . The pre -qualification designation is solely <br />within the discretion of the and the specifically reserves the right to <br />change or revoke the designation for a stated written reason(s). <br />Denial of pre -qualification shall be in writing and shall be forwarded to the contractor within <br />seven (7) working days of such decision. Any contractor denied or losing pre -qualification <br />status may request reconsideration of the decision by submitting such request in writing to the <br />within five (5) business days of receipt of notice of denial. <br />IV. Incomplete Submissions by Bidders <br />It is the sole responsibility of the bidder to comply with all submission requirements herein no <br />later than the public bid opening. Submissions deemed inadequate, incomplete, or untimely by <br />the shall result in the automatic disqualification of the bid. <br />V. Responsive and Responsible Bidder Determination <br />After its review of complete and timely submissions, taking into account all information in the <br />submission requirements, the shall in its sole discretion, determine whether a <br />bidder or subcontractor is responsive and responsible. The reserves the right to <br />utilize all information provided in the bidder or subcontractor's submission or any information <br />obtained by the through its own independent verification of the information <br />provided. <br />VI. Certified Payroll <br />For projects in which the cost is at least one -hundred fifty thousand dollars ($150,000), the <br />successful bidder and all subcontractors working on a public works project shall submit a <br />certified payroll report utilizing federal form WH-347 or its successor form, which must be <br />prepared on a weekly basis and submitted to the within ten (10) calendar days <br />after the end of each week in which the successful bidder or subcontractor performed on the <br />public works project. Certified payroll reports shall identify the job title and craft of each <br />employee on the project, e.g. journeyman electrician or apprentice electrician. In the event any <br />successful bidder or subcontractor uses independent contractors to perform work on the project, <br />such individual must be identified on the federal form WH-347 or successor form with the <br />same information as is required for employees. <br />The may withhold payment due for work performed by a successful bidder or <br />subcontractor for failure to timely submit their respective certified payroll reports until such <br />time as the reports are submitted. The shall not withhold payment to a successful <br />bidder or subcontractor for failure of the successful bidder or one or more other subcontractors <br />to timely submit their certified payroll reports. <br />4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.