Laserfiche WebLink
EXHIBIT B <br />Fees Payable to the City <br />1. Park Dedication. The PERMITTEE is responsible for satisfying applicable Park Dedication Fee <br />requirements. PERMITTEE must pay a Park Dedication Fee of $150,400.00 (32 units x $4,700.00 <br />per unit). <br />2. Trail Development Fees. The PERMITTEE is responsible for satisfying applicable Trail <br />Development Fee requirements. PERMITTEE must pay a Trail Development Fee of $50,400.00 <br />(32 units x $1,575.00 per unit). <br />3. Sanitary Sewer Connection (Trunk) Fees. The PERMITTEE is responsible for satisfying <br />applicable Sanitary Sewer Trunk Fee requirements. PERMITTEE must pay a Sanitary Sewer <br />Trunk Fee of $46,208.00 (32 units x $1,444.00). <br />4. Water Connection (Trunk) Fees. The PERMITTEE is responsible for satisfying applicable Water <br />Trunk Fee requirements. PERMITTEE must pay a Water Trunk Fee of $68,832.00 (32 units x <br />$2,151.00 per unit). <br />5. Stormwater Management Fee. The PERMITTEE is responsible for satisfying applicable <br />Stormwater Trunk Fee requirements. PERMITTEE must pay a Stormwater Management Fee of <br />$18,304.00 (32 units x $572.00 per unit). <br />6. COR Stormwater Basin Contribution. The PERMITTEE previously paid $27,677.50 to contribute <br />to the costs of the regional stormwater basin in lieu of providing on -site stormwater basins. This <br />amount covers the previous phases, current phase and future phases within Outlot F. <br />7. Street Sign Fee. While the CITY provides and installs the street name and traffic control signage, <br />the PERMITTEE is responsible for paying for them at a rate of $ 265.00 per sign. PERMITTEE <br />must pay a Street Sign Fee of $795.00 (3 x $265.00 no parking signs). <br />8. Development Fees for the Outlots. The PERMITTEE acknowledges that development fees are <br />not being collected for any Outlots. The PERMITTEE acknowledges that development fees will <br />be due upon development of any of the Outlots. The rate in effect at the time said future plat(s) is <br />recorded will be collected. <br />12 <br />