My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 08/10/2026
Ramsey
>
Public
>
Agendas
>
Council
>
2026
>
Agenda - Council - 08/10/2026
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/12/2026 4:39:41 PM
Creation date
8/6/2026 3:59:27 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
08/10/2026
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
162
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT B <br />Fees Payable to the City <br />1. Park Dedication. The PERMITTEE is responsible for satisfying applicable Park Dedication Fee <br />requirements. PERMITTEE must pay a Park Dedication Fee of $150,400.00 (32 units x $4,700.00 <br />per unit). <br />2. Trail Development Fees. The PERMITTEE is responsible for satisfying applicable Trail <br />Development Fee requirements. PERMITTEE must pay a Trail Development Fee of $50,400.00 <br />(32 units x $1,575.00 per unit). <br />3. Sanitary Sewer Connection (Trunk) Fees. The PERMITTEE is responsible for satisfying <br />applicable Sanitary Sewer Trunk Fee requirements. PERMITTEE must pay a Sanitary Sewer <br />Trunk Fee of $46,208.00 (32 units x $1,444.00). <br />4. Water Connection (Trunk) Fees. The PERMITTEE is responsible for satisfying applicable Water <br />Trunk Fee requirements. PERMITTEE must pay a Water Trunk Fee of $68,832.00 (32 units x <br />$2,151.00 per unit). <br />5. Stormwater Management Fee. The PERMITTEE is responsible for satisfying applicable <br />Stormwater Trunk Fee requirements. PERMITTEE must pay a Stormwater Management Fee of <br />$18,304.00 (32 units x $572.00 per unit). <br />6. COR Stormwater Basin Contribution. The PERMITTEE previously paid $27,677.50 to contribute <br />to the costs of the regional stormwater basin in lieu of providing on -site stormwater basins. This <br />amount covers the previous phases, current phase and future phases within Outlot F. <br />7. Street Sign Fee. While the CITY provides and installs the street name and traffic control signage, <br />the PERMITTEE is responsible for paying for them at a rate of $ 265.00 per sign. PERMITTEE <br />must pay a Street Sign Fee of $795.00 (3 x $265.00 no parking signs). <br />8. Development Fees for the Outlots. The PERMITTEE acknowledges that development fees are <br />not being collected for any Outlots. The PERMITTEE acknowledges that development fees will <br />be due upon development of any of the Outlots. The rate in effect at the time said future plat(s) is <br />recorded will be collected. <br />12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.