Laserfiche WebLink
Request for Proposal <br />Task 1-Confirm Understanding/Approach to the Project <br />Consultant to review the project goals with City staff and to finalize the project approach. Topics <br />to be discussed include but are not limited to: <br />• identification of key issues, <br />• explore preliminary concepts for integrating a residential housing component within the <br />general area, <br />• sources of background information, <br />• potential uses and connections, <br />• support materials necessary for meetings with City staff and consultants, <br />• project phasing and ownership issues, as well as project schedule, <br />• identify alternative funding mechanisms for park development, <br />• Public participation <br />NOTE: Some of this Task's issues may actually occur prior to the consultant preparing the <br />proposal as scoping activity. <br />Task 2 -Assemble Base Information -Tour Project Area <br />Consultant to assemble project base maps from available data sources. Existing boundary and <br />topographical surveys and aerial photography will be used to create aCAD/GIS base map for the <br />project area. Additionally, confer with the Anoka County Conservation District on the land cover <br />and natural resources and as well as soils patterns. During the project tour, a photographic <br />inventory is to be completed and project features that are not apparent on the base maps will be <br />added. <br />Task 3 - Generate a Park Service Area Analysis <br />Consultant to gather and compile relevant land use and housing information to determine the <br />likely number of near and long term users of the proposed park facilities. Identify `highest and <br />best' land use within service area for planning purposes. Review appropriate public planning <br />documents and existing plats to estimate households that will be within reasonable walking or <br />biking distance from the park. Analyze how other nearby park facilities (existing and proposed) <br />will compliment or place demands within the new park. <br />Task 4 -Develop Concept Plans <br />Consultant will assemble two to three concept master plans. The purpose of the plans is to <br />broadly explore varying approaches to the overall development of the park area. Concepts will <br />investigate different use placements, patterns of structured and unstructured open space, and a <br />variety of trail and access alternatives. Concept plans will relate possible future housing within <br />service area to park planning. <br />Assist in hosting an open house at a regular Park and Recreation Commission meeting to receive <br />additional ideas and comment from residents on the varying concept plans. <br />