aggregate will be reclaimed, geogrid will be placed on top of the reclamation, followed by 6-inches of new <br />aggregate base and 4.5-inches of new bituminous pavement. The extra weight will cause for some settlement, the <br />intent of the geogrid is to both help bridge and cause even settlement. Only the first lift of new pavement will be <br />placed in the fall of 2026. The final wear course will be placed in the spring of 2027 after the spring thaw and <br />allowing for any settlement to occur. <br />The existing culvert for County Ditch No. 51 is a metal culvert with noted deterioration at the ends. The culvert <br />will be replaced to the same elevation and diameter, but with reinforced concrete pipe. Concrete end caps and <br />sheet piling will be used to avoid any settlement of the new culvert pipe. <br />No municipal water or sanitary sewer exists within the project area. The water was extended to the north end of <br />Variolite Street in 2020. Development at the intersection of 175th Avenue and Nowthen Boulevard (CSAH 5) <br />may bring watermain to this intersection in the near future. The current Comprehensive Plan includes a trunk <br />watermain loop connection between these two points. Staff recommends making the trunk watermain loop <br />connection at a later date, when development along 175th Avenue drives it, since the construction would likely be <br />directional drilling and would not have significant cost savings combining it with an overlay improvement. <br />Additional Permitting <br />Staff has been working with the Lower Rum River WMO to obtain a permit for wetland filling associated with the <br />improvements to 173rd Avenue between Puma Street and Iguana Street. Anoka County Highway Department <br />(ACHD) permits will be required for the connections at both Armstrong Boulevard and Nowthen Boulevard. An <br />ACHD permit will also be required for replacing the Ditch 51 culvert. These permit processes have all started and <br />staff does not anticipate any impacts to the project timeline. To use Municipal State Aid funding for this project, a <br />MnDOT MSA approval is also required. Staff has received MnDOT MSA approval, which was required prior to <br />opening bids for this project. <br />Preliminary Schedule Remaining <br />• Council awards contract to the lowest responsible bidder <br />()August 25, 2026 <br />• Contractor begins construction <br />o September 2026 <br />• Contractor substantially completes phase 1 <br />o October 16, 2026 <br />o Completes mill and overlay (entire project area except between Puma Street and Iguana Street) <br />o Replaces Ditch 51 culvert <br />o First lift new pavement between Puma Street and Iguana Street <br />o Temporary restoration in -place <br />• Contractor substantially completes phase 2 <br />o May 31, 2027 <br />o Final lift of new pavement between Puma Street and Iguana Street <br />o Final restoration in -place <br />o Create final punch list <br />• Contractor final completion <br />o June 30, 2027 <br />o Verify final restoration; punch list complete <br />Notification: <br />If City Council awards a contract for construction, letters will be mailed to property owners with updates on the <br />project status. Engineering staff maintains City Improvement webpages with the most current project information. <br />This can be found on the city website, Engineering Department page. <br />Time Frame/Observations/Alternatives: <br />