Timeframe: <br />Staff estimates up to 10 minutes will be required to present this case and answer questions. <br />Observations: <br />Due to replacing the Ditch 51 culvert and other associated work, 173rd Avenue will be fully closed for <br />approximately 4 to 6 weeks between Puma Street and Iguana Street. A signed detour route will be set up as part of <br />the project. <br />Alternatives: <br />Alternative #1 — Motion to adopt Resolution #26-195 accepting bids and awarding a contract to North Valley, Inc. <br />for the total amount of $1,129,093.12 for 2026 MSA Pavement Overlay Improvements, Improvement Project <br />#26-02. <br />Alternative #2 — Motion of other. <br />Funding Source: <br />Funding for this improvement is proposed to come from Municipal State Aid Funds and Storm Water Utility <br />Funds. <br />On August 17, 2026, a total of four (4) bids were received, opened, and tabulated, and the following bids were <br />found to comply with the advertisement for bids. <br />Contractor <br />Total Bid <br />North Valley, Inc. <br />$1,129,093.12 <br />Knife River Corporation — North Central <br />$1,222,652.30 <br />Park Construction Company <br />$1,237,145.67 <br />GMH Asphalt Corporation <br />$1,285,629.12 <br />Engineer's Estimate <br />$1,329,122.25 <br />The bid of North Valley, Inc. of Nowthen, Minnesota, in the amount of $1,129,093.12 for the total bid of said <br />improvements in accordance with the approved plans and specifications and advertisement for bids, is the lowest <br />responsible bidder. Adding indirect costs in the amount of 14-percent brings the total project costs to <br />$1,287,166.16. <br />The bid is 15-percent lower than the engineer's estimate, primarily due to lower than anticipated pavement <br />milling and paving pricing. <br />Funding Source Breakdown: <br />Funding Source <br />Construction Costs <br />Indirect Costs <br />Total Cost <br />Municipal State Aid <br />$1,068,884.71 <br />$149,643.86 <br />$1,218,528.57 <br />Storm Sewer Utility <br />$60,208.41 <br />$8,429.18 <br />$68,637.59 <br />Project Total <br />$1,129,093.12 <br />$158,073.04 <br />$1,287,166.16 <br />The CIP level estimate had a total estimated project cost of $1,290,087 (1,121,815 MSA Funds, $168,272 Storm <br />Water Utility Funds). The final project costs may change depending upon bid prices and actual construction <br />quantities. <br />City staff proposes to administer and inspect construction. Plans and specifications were prepared in-house as part <br />of staffs normal duties. <br />Recommendation: <br />Staff recommends Alternative # 1. <br />