Laserfiche WebLink
<br />Case #4: <br /> <br />Review Revised Feasibility Studies for Sewer & Water Extension for 157th <br />Lane and Ramsey Boulevard <br /> <br />Background: <br /> <br />It has been between 12 to 18 months from the time the petitions have been presented for these <br />projects and it is important to determine the level of support for these projects now that assessed <br />costs to the benefited properties have been identified. . <br /> <br />Consensus of the Committee was to direct staff to hold an informational meeting with the <br />property owners regarding the revised feasibility studies, and to provide the property owners <br />with information on assessment options based on the following scenarios: assessments by <br />developable lots, by front footage, and a combination of both methods. <br /> <br />Action: <br /> <br />Ratify the recommendation of the Public Works Committee. <br /> <br />COMMITTEE INPUT <br /> <br />Reviewed by: <br />Public Works Director/Principal City Engineer <br />City Engineer <br /> <br />CC: 3/13/07 <br /> <br />-155- <br />