My WebLink
|
Help
|
About
|
Sign Out
Home
Minutes - Parks and Recreation Commission - 03/08/2007
Ramsey
>
Public
>
Minutes
>
Parks and Recreation Commission
>
2007
>
Minutes - Parks and Recreation Commission - 03/08/2007
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/4/2026 2:09:58 PM
Creation date
9/4/2026 2:09:13 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Minutes
Meeting Type
Parks and Recreation Commission
Document Date
03/08/2007
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Case #1: 2007 Park CIP Projects <br />Parks Supervisor Riverblood reviewed the projects in the 2007 Park CIP with the Commission. <br />He noted the projects are primarily funded by the Park Trust Fund and Lawful Gambling <br />Improvement Fund. <br />Parks Supervisor Riverblood explained Phase 3 development of Elmcrest Park which will consist <br />of trees, shrubs and perennial plants throughout the park, an arched bridge on the most northerly <br />wooded trail, the addition of a couple of zones of irrigation; and possibly a modest park entry <br />sign for the neighborhood connection at Uranium Street if the budget allows. <br />(The first part of the third phase of Elmcrest's development was the base bid irrigation and a <br />small portion of the landscape materials; and was approved by City Council in November of <br />2006 at $55,000.) <br />The landscape element is significant with many hundreds of shrubs and flowers, as well as 230 <br />cubic yards of hardwood mulch. Ramsey Cub Scout and Boy Scout Troops #362 both have <br />volunteered to perform the majority of this part of the project with staff on the third weekend in <br />May. This volunteer labor contribution is estimated in excess of $8,000. <br />Chairperson Johns asked if the bridge will replace a part of the bituminous path at north part of <br />the park. <br />Parks Supervisor Riverblood responded yes, and indicated the bituminous path does flood at <br />times and they will use the bituminous path for the abutments for the bridge. <br />Riverblood reviewed the Fox Park boardwalk project. As part of the 1995 development of the <br />park, a boardwalk was constructed to connect two halves of non -wetland area in the park. Storm <br />events and other factors necessitate its replacement. <br />He noted they would like to replace the north and south parts of the boardwalk with an eight <br />foot wide boardwalk. This would be an approximate $12,000 expense. <br />Chairperson Johns wondered if they will be keeping the seating area. <br />Parks Supervisor Riverblood indicated they would. <br />Motion by Commissioner Olds, seconded by Commissioner Shryock, to recommend City <br />Council approval of the 2007 Capital Improvement for Elmcrest and Fox Parks. <br />Motion carried. Voting Yes: Chairperson Johns, Commissioners Olds, Shryock, Barr, Hansen, <br />and LaMere. Voting No: None. Absent: Erickson. <br />Case #2: Skate Park Planning — Evaluate Alpine Park <br />Park and Recreation Commission/March 8, 2007 <br />Page 2 of 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.