Laserfiche WebLink
5. 6. <br />CC Regular Session <br />Meeting Date: 09/08/2026 <br />Primary Strategic Plan Initiative: Not Applicable <br />Title: <br />Authorize the Advance Purchase of Fire Vehicle Tablets <br />Purpose/Background: <br />In early 2025, a new company was selected to build a new Computer Aided Dispatch (CAD) mobile system for <br />Police/Fire agencies county -wide. The new system was built and configured by Tyler Tech and has been under <br />the management of the Joint Law Enforcement Council (JLEC) for Anoka County. Agencies, including Ramsey, <br />selected a small implementation team that would be the primary contacts for business practice, technology, and <br />any other questions related to the configuration being done by Tyler Tech. <br />In mid -March, a concern was brought up by other Fire agencies concerning how they log into the new system. <br />Connections to the new Tyler system at the time required connection with a Virtual Private Network (or VPN). <br />Fire staff were concerned this was conducive to their needs, as VPN connections are unique <br />username/password/pin combinations based on the individual. During an update in late May, the JLEC, Tyler <br />Tech, and Logis had worked to establish a Relay server for the Fire side of the program. There were details still to <br />be worked out as of the end of May, but the idea is the relay server would take traffic from specifically the Fire <br />applications and pass it through to the appropriate Tyler Tech software. This potentially could eliminate VPN as a <br />need for Fire staff. <br />Ramsey IT was trained in early May how to install the Police and Fire modules for the vehicles. In the same <br />timeframe, PD was trained to do the installations for the APP version of the software for tablets, as well as the <br />cell phone APP. <br />Over the summer, IT Manager Fredrickson spoke with Fire Department Staff about the coming CAD <br />implementation. It paralleled talks about computer replacements for the Fire Department vehicles. The vehicle <br />laptops are 8 years old as of 2026. After several talks, Fire Staff decided they would like to move to having tablets <br />in the vehicles and use the Tyler Tech APP for CAD use. Cost per device is lower. The cost for each cell <br />connection is equivalent to what we currently use. So, the change made sense to pursue pending the approval of <br />the Fire and PD laptops which were made for 2027. New docks would be needed, but the cost per device savings <br />may be able to cover the dock purchase. <br />At the last Council work session in August 2026, Fire Chief Winkel asked for support in bringing the tablet <br />purchase from 2027 into 2026. By moving in this direction, we would be able to avoid any complications from <br />the VPN requirement on the desktop version of the software (which is still up in the air), and enable our Fire Staff <br />to get trained on the tablet version as early as possible. Staff, as of this writing, are asking for 13 tablets with 15 <br />docks for fire trucks and command vehicles. Two Fire staff currently have tablets new enough that we can <br />continue to utilize them for this additional purpose. Currently, there is money in the 2027 preliminary budget for <br />Fire Vehicle device replacements involving seven vehicles. <br />Time Frame/Observations/Alternatives: <br />