My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 10/13/2026
Ramsey
>
Public
>
Agendas
>
Council
>
2026
>
Agenda - Council - 10/13/2026
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/23/2026 9:16:09 AM
Creation date
10/16/2026 3:54:33 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
10/13/2026
Supplemental fields
Year
%(Da
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
228
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
7 I Infrastructure Efficiency I Same Homes, More Road <br />MODELING ASSUMPTION <br />Hold development yield at 30 detached single-family homes. Use $450,000 per home as a conservative representative <br />modeling assumption: $13.5 million total modeled residential value. Use approximately $134/1inear foot as a Ramsey rural <br />residential reconstruction benchmark derived from two Ramsey CIP precedents. <br />Street length <br />600 ft <br />1,000 ft <br />3,000 ft <br />Road ft/home <br />20 <br />33.3 <br />100 <br />Relative road <br />1.0x <br />1.67x <br />5.0x <br />Reconstruction benchmark <br />-$80,400 <br />-$134,000 <br />-$402,000 <br />SAME 30 HOMES. SAME $13.5 MILLION MODELED VALUE. FIVE TIMES THE ROAD. <br />At 600 feet, thirty homes require 20 feet of roadway per home. At 3,000 feet, the same thirty homes require 100 feet <br />per home — five times the roadway infrastructure supporting the same modeled development yield. <br />WHAT IT ESTABLISHES <br />Holding development yield constant, infrastructure per home rises directly with street length. <br />Limitation: $450,000 is a modeling assumption, not a Rum River Retreat appraisal.—$134/ft is a reconstruction benchmark, not new -road construction <br />cost. This demonstrates declining infrastructure efficiency, not guaranteed taxpayer loss. <br />Ramsey Countryside Estates reconstruction precedent <br />Ramsey Hall -Anderson / Oakwood Hills reconstruction nrecedent <br />October 13, 2026 I Ramsey cul-de-sac / dead-end street policy Page 8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.