Laserfiche WebLink
Project Name <br />2027 <br />Priority 1-Existing Obligation (High) <br />2027 through 2036 <br />Capital Improvement Plan <br />Ramsey, MN <br />Projects By Year & Priority <br />Department <br />Project # Priority Project Cost <br />Stormwater Drainage Improvements Stormwater Utility 12-STRM-001 1 350,000 <br />Reconstruction Streets: Sortebergs 6th Street Improvements 17-STR-007A 1 941,160 <br />Concrete Repairs Sunwood Dr/Rhinestone St Street Improvements 17-STR-012 1 1,245,454 <br />Reconstruction Streets: Windsorwood Street Improvements 19-STR-016 1 478,170 <br />City Hall Repair Exterior/Interior Municipal Buildings 20-BLDG-002 1 500,000 <br />River's Bend South Shelter Replacement Park Improvements 21-PARK-001 1 165,000 <br />2027 MSA Overlays Street Improvements 21-STR-016 1 1,116,400 <br />2027 Neighborhood Overlays Street Improvements 21-STR-017 1 1,325,363 <br />MSA Juniper Ridge Dr Street Reconst Street Improvements 21-STR-018 1 478,688 <br />MSA 142nd Avenue Street Reconstruction Street Improvements 21-STR-021 1 99,619 <br />Playground Replacement Program Park Improvements 22-PARK-001 1 145,000 <br />Annual MSA Pavement Marking Improvements Street Improvements 22-STR-001 1 20,000 <br />Windemere Woods Street Reconstruction Street Improvements 22-STR-008 1 808,163 <br />Hall -Anderson Acres Street Reconstruction Street Improvements 23-STR-012 1 1,335,840 <br />Oakwood Hills & Rambosek Red Oak Estates St <br />Street Improvements 23-STR-013 1 379,500 <br />Recon <br />Deerwood Street Reconstruction Street Improvements 23-STR-028 1 857,670 <br />Park Building(s) Stabilization Park Improvements 24-PARK-001 1 175,000 <br />Outdoor Hockey Rinks Park Improvements 25-PARK-002 1 420,000 <br />Re -roof Park Shelters/Flintwood Ter &Alpine Park Park Improvements 25-PARK-003 1 75,000 <br />Re -roof Warming House & Park Center Bldg Central <br />Park Park Improvements 27-PARK-003 1 50,000 <br />Lift Station #1 Rehab Sewer Utility 27-SW-001 1 80,000 <br />#621 Exmark replacement Water Utility 27-WTR-002 1 22,500 <br />Replace 5R Siren Capital Equipment CIVIL-5R 1 35,000 <br />Replace Engine #21 (565) Capital Equipment FIRE-502 1 600,000 <br />Replace Fire Chief Vehicle (573) Capital Equipment FIRE-569A 1 50,000 <br />Replace Assistant Fire Chief (395) Capital Equipment FIRE-594 1 55,000 <br />Replace Fire Prevention Vehicle (373) Capital Equipment FIRE-595 1 55,000 <br />Replace PD and FD Vehicle Laptops Capital Equipment IT-003 1 112,970 <br />2027 Vehicle replace 2021 Ford Explorer #312 Capital Equipment POL-391 1 50,000 <br />2027 Patrol Squad Replace 2023 Dodge Charger <br />#330 Capital Equipment POL-395 1 50,000 <br />2027 Patrol Squad Replace 2021 Ford Explorer #313 Capital Equipment POL-421 1 50,000 <br />Replace 2004 Snogo #647 Capital Equipment PW-005 1 250,000 <br />Replace Unit #686 - 2015 Kubota Tractor Capital Equipment PW-686 1 132,000 <br />Replace 2016- Ford Crew Cab Unit #692 Capital Equipment PW-692A 1 116,000 <br />Replace 683 2014 Exmark mower Capital Equipment PW-726 1 20,900 <br />Replace 2007 Tandem Axle Plow Truck #662 Capital Equipment PW-759 1 380,000 <br />Total for: Priority 1 13,025,397 <br />Priority 2-New Addition (High) <br />Park Development in The COR Park Improvements 08-PARK-005 2 225,000 <br />Northfork North Trail Connection Park Improvements 17-PARK-007 2 150,000 <br />Amphitheater Lighting and Audio Enhancements Park Improvements 18-PARK-003 2 40,000 <br />Aeration for Sunfish Lake Park Improvements 18-PARK-005 2 40,000 <br />Bunker Lake Blvd & Puma Street Lights Street Light Utility 19-STLT-001 2 175,000 <br />2026 MSA Overlays Street Improvements 24-STR-001 2 108,338 <br />Water Meter Reading Fixed Network Water Utility 25-WTR-002 2 175,000 <br />15 <br />Produced Using Plan -It CIP Software <br />