Laserfiche WebLink
Project Name Department Project # Priority Project Cost <br />GREP Area F/Beatty & Collins Street Improvements 26-STR-001 2 250,000 <br />GREP Area E - 148th Lane Street Improvements 26-STR-002 2 30,000 <br />The Waterfront -Phase Three Park Improvements 27-Park-001 2 326,000 <br />Sunwood Drive Roundabout Park Improvements 27-PARK-005 2 75,000 <br />8 new cameras for City Parks Capital Equipment 27-Park-006 2 24,000 <br />Well #1 Raw Water Main Water Utility 27-WTR-001 2 2,700,000 <br />New Building Inspection Vehicle Capital Equipment GENGOV-008 2 36,000 <br />2027 GMC Sierra 2500 Capital Equipment GENGOV-022 2 55,000 <br />Total for: Priority 2 4,409,338 <br />Total for 2027 17,434,735 <br />2028 <br />Priority 1-Existing Obligation (High) <br />Engineering Plotter Replacement Capital Equipment 17-IT-011 1 15,000 <br />City Hall Repair Exterior/Interior Municipal Buildings 20-BLDG-002 1 600,000 <br />2028 Neighborhood Overlays Street Improvements 21-STR-020 1 565,488 <br />Annual MSA Pavement Marking Improvements Street Improvements 22-STR-001 1 124,000 <br />MSA - Alpine Drive St Recon (Variolite/Ramsey Blvd Street Improvements 22-STR-006 1 604,828 <br />The North Forty Street Reconstructions Street Improvements 22-STR-009 1 867,082 <br />Ramsey Rugged Switches Capital Equipment 23-IT-001 1 21,000 <br />Section 21 Unplatted Street Improvements 23-STR-014 1 2,376,733 <br />Ramsey Meadows 1st, 3rd & 4th Street Recon Street Improvements 23-STR-015 1 358,058 <br />Brookview Estates North Street Reconstruction Street Improvements 23-STR-033 1 658,757 <br />MSA- Alpine Drive (TH 10 and Puma Street) Street Improvements 24-STR-002 1 1,374,170 <br />Brookview Estates (South) Street Recon Street Improvements 24-STR-006 1 634,828 <br />Emergency Backup Generator LS #7 Sewer Utility 25-SEW-002 1 225,000 <br />Rivenwick 1st & 2nd St Reconstruction Street Improvements 25-STR-005 1 1,025,789 <br />Replace 7R Siren Capital Equipment CIVIL-7R 1 35,000 <br />Replace Grass 11 (562) Capital Equipment FIRE-505 1 60,000 <br />Replace Aerial Ladder Truck Capital Equipment FIRE-560 1 675,000 <br />2027 PD Investigator replace 2017 Taurus #377 Capital Equipment POL-385 1 58,000 <br />2028 Ford Utility Replace 2024 Ford Expl #344 Capital Equipment POL-399 1 71,895 <br />2028 Patrol Squad Replace 2024 Durango #340 Capital Equipment POL-404 1 77,000 <br />2028 Admin Sgt Replace 2020 GMC #305 Chief Capital Equipment POL-420 1 65,000 <br />2028 Patrol Squad Replace 2024 Ford Exp #342 Capital Equipment POL-422 1 71,895 <br />Replace 2019 Brush Chipper - Unit #605 Capital Equipment PW-605 1 80,000 <br />Replace Unit 617 2021 Toro Mower Capital Equipment PW-679A 1 115,000 <br />Replace Unit #687 2015 Toolcat Capital Equipment PW-687 1 66,000 <br />Replace 2018 Street Sweeper - Unit #694 Capital Equipment PW-694A 1 330,000 <br />Replace 2017 UTV- Unit #695 Capital Equipment PW-695 1 32,000 <br />Replace 2017 UTV- Unit #696 Capital Equipment PW-696 1 32,000 <br />Replace 2018 Ford F-250 Extended Cab: Unit #601 Capital Equipment PW-705 1 85,000 <br />Replace 2018 Ford F350 With Box: Unit #697 Capital Equipment PW-707 1 350,000 <br />Replace 2018 Ford F250 Pickup: Unit #698 Capital Equipment PW-708 1 85,000 <br />Replace 2018 Ford F350 -Dump & Plow: Unit #699 Capital Equipment PW-709 1 116,000 <br />Replace #607 1998 Felling Trailer Capital Equipment PW-786 1 21,000 <br />Replace #321 2012 Chevy Tahoe Capital Equipment PW-787 1 34,000 <br />Total for: Priority 1 11,910,523 <br />Priority 2-New Addition (High) <br />Trail Connections Park Improvements 06-PARK-019 2 30,000 <br />Construct Well #9 and Pumphouse #5 Water Utility 16-WTR-002 2 1,100,000 <br />Well #10 and Pump House #6 Water Utility 24-WTR-001 2 1,750,000 <br />Alpine Park Restroom Park Improvements 26-Park-003 2 200,000 <br />GREP Area E - 148th Lane Street Improvements 26-STR-002 2 400,000 <br />Community Garden @ Traprock Commons Park Improvements 27-PARK-004 2 10,000 <br />Alpine & Armstrong Roundabout Landscaping Street Improvements 27-STR-011 2 150,000 <br />Produced Using Plan -It CIP Software <br />16 <br />