|
Project Name Department Project # Priority Project Cost
<br />2028 GMC Terrain Engineering Capital Equipment GENGOV-021 2 40,000
<br />New 1-Ton Pickup With Box & Plow Equipment Capital Equipment PW-703 2 116,000
<br />Second Fuel Island at Public Works Capital Equipment PW-736 2 191,500
<br />New 2-Post Rotary Lift Capital Equipment PW-741 2 66,500
<br />New Ford F-550 w/ Dump & Plow Capital Equipment PW-789 2 114,000
<br />Total for: Priority 9, 4,168,000
<br />Total for 2028 16,078,523
<br />2029
<br />Priority 1-Existing Obligation (High)
<br />City Hall Repair Exterior/Interior Municipal Buildings 20-BLDG-002 1 575,000
<br />Playground Replacement Program Park Improvements 22-PARK-001 1 155,000
<br />Annual MSA Pavement Marking Improvements Street Improvements 22-STR-001 1 21,000
<br />Replace Aerial Ladder Truck Capital Equipment FIRE-560 1
<br />Total for: Priority 1
<br />Priority 2-New Addition (High)
<br />675,000
<br />1,426,000
<br />Trail Connections Park Improvements 06-PARK-019 2
<br />Total for: Priority 2
<br />Priority 3-Existing Obligation (Med)
<br />140,000
<br />140,000
<br />Refurbish Water Tower #2 Water Utility 14-WTR-001 3 1,300,000
<br />2029 MSA Overlays Street Improvements 21-STR-022 3 328,776
<br />2029 Neighborhood Overlays Street Improvements 21-STR-023 3 541,615
<br />Section 17 Unplatted Street Reconstruction Street Improvements 23-STR-016 3 999,422
<br />Alicia Street Reconstruction Street Improvements 23-STR-017 3 666,281
<br />Menkvelds Country Park/Volting Oak Hill Est Recon Street Improvements 23-STR-019 3 742,682
<br />Sunfish Square 1st & 2nd Street Reconstruction Street Improvements 23-STR-020 3 713,366
<br />Emergency Backup Generator LS #4 Sewer Utility 25-SEW-001 3 250,000
<br />Autumn Meadows Str Recon Street Improvements 26-STR-007 3 130,700
<br />Replace 9R Siren Capital Equipment CIVIL-9R 3 35,000
<br />Replace Fire Vehicle #571 Capital Equipment FIRE-566A 3 55,000
<br />Replacement Fire Prevention Vehicle (572) Capital Equipment FIRE-587 3 50,000
<br />Extrication Tools -Rescue 21 Capital Equipment FIRE-588 3 55,000
<br />Replace 2019 Chev Equinox (414) Capital Equipment GENGOV-006 3 44,000
<br />Replace 2019 Chev Equinox (413) Capital Equipment GENGOV-007 3 44,000
<br />Replace 2019 Chev Equinox #412 Capital Equipment GENGOV-013 3 44,000
<br />2027 Patrol Squad Replace 2023 Chev Tahoe #323 Capital Equipment POL-394 3 68,880
<br />2029 Chevy Tahoe Replace 2024 Chevy Tahoe #343 Capital Equipment POL-398 3 73,750
<br />2029 Vehicle Replace 2025 Tahoe Capital Equipment POL-401 3 76,500
<br />Replace Unit #602: 2019 Utility Tractor Capital Equipment PW-717 3 190,000
<br />Replace Unit #604: 2019 Backhoe Capital Equipment PW-718 3 100,000
<br />Replace Unit #415: 2019 Chevy Silverado Pickup Capital Equipment PW-719 3 75,000
<br />Replace Unit 682 - 2015 International Plow Truck Capital Equipment PW-738 3 350,000
<br />Replace #649 2024 Exmark Zero -Turn Mower Capital Equipment PW-763 3 20,000
<br />Replace #645 2024 Exmark Zero -Turn Mower Capital Equipment PW-764 3 20,000
<br />Replace #643 2024 Exmark Zero -Turn Mower Capital Equipment PW-765 3 20,000
<br />Replace #641 2024 Exmark Zero -Turn Mower Capital Equipment PW-766 3
<br />Total for: Priority 3
<br />Priority 4-New Addition (Med)
<br />20,000
<br />7,013,972
<br />GREP Area A - Xenolith St & 178th Lane Street Improvements 26-STR-003 4 45,000
<br />New F550 4X4 with Utility Box an Boss V-Plow Capital Equipment PW-740 4 200,000
<br />Total for: Priority 4 245,000
<br />Total for 2029 8,824,972
<br />2030
<br />Priority 1-Existing Obligation (High)
<br />17
<br />Produced Using Plan -It CIP Software
<br />
|