Laserfiche WebLink
5. 12. <br />CC Regular Session <br />Meeting Date: <br />10/27/2026 <br />Primary Strategic Plan Initiative: Address infrastructure needs. <br />Title: <br />Adopt Resolution #26-241 Approving Final Plans and Specifications and Authorizing Advertisement for Bids for Deerwood <br />Street Reconstructions, Improvement Project #27-03 <br />Purpose/Background: <br />Purpose: <br />The purpose of this case is to adopt Resolution #26-241 approving final plans and specifications and authorizing <br />advertisement for bids for Deerwood Street Reconstructions, Improvement Project #27-03. <br />Background: <br />The 2026 — 2035 Capital Improvement Plan (CIP) identifies the streets within Deerwood for street reconstruction in 2027. A <br />street segment summary for the project is attached to this case. <br />Proiect History <br />• March 24, 2026, City Council adopted Resolution #26-080, ordering request for proposals for topographic surveys, <br />geotechnical evaluations, and utility testing for 2027 Pavement Management Program projects. <br />• April 28, 2026, City Council adopted Resolution #26-099, accepting and awarding a proposal to Hakanson Anderson <br />Associates for topographic survey of the project area. <br />• May 12, 2026, City Council adopted Resolution #26-106, accepting and awarding a proposal to Haugo Geotechnical <br />Services for the project area. <br />• May 26, 2026, City Council adopted Resolution #26-118, ordering the City Engineer to prepare plans and <br />specifications for Deerwood Street Reconstructions, Improvement Project #27-03. <br />• October 20, 2026, the Ramsey Public Works Committee recommended City Council approve final plans and <br />specifications and authorize advertisement for bids for said improvements. <br />Existine Conditions <br />This project proposes to reconstruct streets within the Deerwood subdivision, generally located along Gibbon Street and <br />Eland Street, north of 173rd Avenue. The streets are 24-foot-wide rural section, totaling 1.13 miles in length. Traffic counts <br />have not been taken within the project area, however, there are no known destinations within the subdivision which would <br />increase traffic above normal. Drainage is handled through street crossing culverts and drainage swales which generally <br />carry storm water to existing wetlands throughout the subdivision. <br />The streets within Deerwood were constructed in 1982 and received an overlay in 1998. Since the overlay crack seal / seal <br />coat treatments were perfouned in 2004 and 2012. Significant patching has been performed over the last several years. <br />Ground Penetrating Radar (GPR) data shows an average pavement section of 6.5 to 8.7 inches, including 3.6 to 4.5 inches of <br />bituminous over 2.4 to 5.1 inches of aggregate base. The geotechnical report included pavement cores which showed similar <br />pavement sections, some of the cores essentially disintegrated while coring, with the pavement being brittle. The subsoils are <br />composed of poorly graded sand, poorly graded sand with silt, silty sand and one boring found clayey sands. Poorly graded <br />sand and poorly graded sand with silt are considered excellent material for utility and road support. Silty sand and clayey <br />sand can be used as utility and road support when properly constructed so they can properly drain, as they can be slightly <br />frost susceptible. Groundwater was found at depths of 7 to 10 feet below the pavement, this is not anticipated to be an issue <br />during construction. <br />Proiect Scone <br />The reconstruction is proposed to be a version of a Full -Depth Reclamation (FDR). Because the existing section isn't thick <br />enough for the new pavement section, after the roadway is reclaimed, the reclaim material must be hauled out, and an <br />additional 3-inches of subsoil material will be hauled out. The reclaim material while be moved back into place to act as a <br />recycled aggregate base, and the new pavement will be placed in two lifts. The new pavement section is proposed to be 3.5- <br />inches of new bituminous over 6-inches of aggregate base. The road profile and alignment generally stay in the same <br />location, with some minor corrections to curves occurring, but does typically impact 6 to 8 feet of adjacent boulevard and <br />driveways. <br />