As noted above some soil borings found silty sand and one found clayey sand. Though it's generally understood proper <br />conditions can make use of this material as road subbase, previous projects with similar material have required removal and <br />replacement and others have not required replacement. With these marginal materials we will know for sure after removal of <br />the bituminous under the load of construction equipment. Because of this the plans include a contingency quantity for minor <br />soil corrections, but no specific removals are called out in the plans. <br />CulTently 177th Avenue east of Eland Street has two existing driveways, including a driveway off the end of the street. There <br />is no turn around on this 24-foot-wide street, which is approximately 330 feet long. To add in vehicles turning around, the <br />plans include building a 66-foot-wide cul-de-sac to extents of the existing right of way. The city owns a parcel on the north <br />side of this street between the two residents, which provides access to the large wetland area to the north. <br />The project includes replacing the existing metal street crossing culverts with reinforced concrete culverts and flared ends to <br />the same location(s) and elevation(s). Only minor grading of the swales to match into the new culverts is proposed. <br />As part of project design staff re -investigated the potential storm sewer improvements considered in 2026 due to a resident <br />complaint of a wet basement. In 2014, when the original complaints occurred, the city experienced several extreme weather <br />events in close succession. These high -intensity events were unusual and are not conditions that regulating agencies require <br />communities to design for when establishing stormwater or floodplain standards. For the properties in question, the <br />established wetland elevation is 895 feet. At the time the homes were constructed, city oversight of grading and basement <br />placement was limited. By todays standards the city would not have recommended basements at these locations given the <br />proximity to the wetland and the associated flood -risk considerations. Staff review did not find that a subdivision wide <br />improvement is necessary, as there does not appear to be a significant risk of the road flooding or properties flooding out, <br />beyond the potential for wet basements during extreme events similar to what occurred in 2014. An individual basement <br />system, including drain tile and a sump pump is a feasible option, which staff assumes was placed or a similar action was <br />taken by the property owners since no complaints have been received in nearly a decade. The storm sewer layout proposed in <br />2016 would not have a significant impact on the flooding potential, which is generated via the extensive wetland complex to <br />the north and within the subdivision. Lowering the wetland itself would have the largest potential impact to flooding <br />concerns, but this is not considered a feasible option, and staff does not find it necessary. <br />Municipal utilities do not exist within the project area, extension of municipal utilities to this subdivision are not proposed as <br />it is outside of the MUSA. <br />Preliminary Schedule Remainine <br />• Staff Advertises for Bids <br />o December 11 & 18, 2026 <br />• Staff Receives Bids <br />o Week of January 18, 2027 <br />• Council Awards Contract to the Lowest Responsible Bidder <br />o January 26, 2027 <br />• Contractor Begins Construction <br />o Spring 2027 <br />• Contractor Substantially Completes Construction <br />o New bituminous pavement in -place, topsoil and seed in -place <br />o July 31, 2027 <br />• Contractor Final Completion <br />o Verify final restoration; punch list created <br />o September 3, 2027 <br />Final plans are not attached to this case to prevent potential bidders from downloading plans attached to the case to prepare <br />and submit their bids, rather than purchasing the plans through QuestCDN, the electronic bidding software used by the City <br />of Ramsey. This ensures all bidders are bidding off the same set of plans, and all bidders are notified of any plan revisions <br />(addenda) issued during the bidding process. <br />Notification: <br />if City Council approves final plans and specifications, bids will be advertised on Friday, December 11, and again on Friday, <br />December 18, 2026, in the City's official newspaper, the Anoka Union Herald. Plans are also advertised on the QuestCDN <br />website, which directly notifies contractors interested in bidding these types of projects. <br />Additionally, letters will be mailed to property owners directly impacted by the improvements. Engineering staff maintains <br />