City Improvement webpages with the most current project information. This can be found on the city website, Engineering <br />Department page. <br />Time Frame/Observations/Alternatives: <br />Observations: <br />Though the plans are finalized, staff has determined a mid -January bid opening to be appropriate. This will allow contractors <br />bidding on the project to have more accurate information for 2027 pricing, and reduce potential speculative pricing <br />contractors may include. Advertisement of the project is proposed to be posted in December, closer to the bid opening date. <br />The public open house was held on September 29, 2026 for this project, one resident attended. Staff has addressed comments <br />outside of the open house from one other resident about the project, in general the main concern staff has received is if <br />municipal utilities would be extended to the subdivision as part of the project in both cases the residents were opposed to <br />utilities. For verification this subdivision is outside of the MUSA and municipal utilities are not proposed. <br />Alternatives: <br />Motion to adopt Resolution #26-241 approving final plans and specifications and authorizing advertisement for bids for <br />Deerwood Street Reconstructions, Improvement Project #27-03. <br />Funding Source: <br />Funding for this improvement is proposed to come from Pavement Management Funds and Storm Water Utility Funds. <br />Below is the engineer's estimate based upon 95% plans and assumed 2027 construction pricing and 23-percent indirect costs. <br />Staff observed a large price increase throughout the 2026 construction season, which is reflected by the engineer's estimate <br />being above the CTP level estimate. Additionally, the CTP level estimate did not anticipate any soil corrections. <br />Pavement Management Funds $976,700 <br />Storm Water Utility Funds $106,000 <br />Total Project Cost $1,082,700 <br />CIP level estimated project costs are $857,670 ($745,800 PMF, $111,870 Storm Water Utility Funds). The final project costs <br />may change depending upon bid prices and actual construction quantities. <br />Recommendation: <br />On October 20, 2026, the Ramsey Public Works Committee recommended City Council approve final plans and <br />specifications and authorize advertisement for bids. <br />Staff recommends adopting Resolution #26-241 approving final plans and specifications and authorizing advertisement for <br />bids for Deerwood Street Reconstructions, Improvement Project #27-03. <br />Outcome/Action: <br />Motion to adopt Resolution #26-241 approving final plans and specifications and authorizing advertisement for bids for <br />Deerwood Street Reconstructions, Improvement Project #27-03. <br />Attachments <br />Res 26-241 <br />27-03 Street Summary <br />27-03 Title Sheet <br />27-03 Typical Section <br />Form Review <br />Inbox Reviewed By Date <br />Brian Hagen Brian Hagen 10/22/2026 08:16 AM <br />Form Started By: Joe Feriancek Started On: 10/19/2026 10:19 AM <br />Final Approval Date: 10/22/2026 <br />