My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 10/27/2026
Ramsey
>
Public
>
Agendas
>
Council
>
2026
>
Agenda - Council - 10/27/2026
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/29/2026 2:28:22 PM
Creation date
10/27/2026 1:54:21 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
10/27/2026
Supplemental fields
Year
%(Da
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
630
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
5. 13. <br />CC Regular Session <br />Meeting Date: <br />10/27/2026 <br />Primary Strategic Plan Initiative: Address infrastructure needs. <br />Title: <br />Adopt Resolutions 26-242, 26-243 and 26-250 Ordering Plans and Specifications for 2027 Pavement Maintenance <br />Improvement Projects <br />Purpose/Background: <br />Purpose: <br />The purpose of this case is to adopt Resolutions 26-242, 26-243 and 26-250 ordering plans and specifications for 2027 <br />pavement maintenance improvements projects which include the 2027 Crack Seal Improvements, 2027 Pavement <br />Rejuvenation Improvements, and 2027 Pavement Marking Improvements. <br />Background: <br />The City's current pavement maintenance schedule calls for public streets to receive the following maintenance following <br />construction, overlay, or reconstruction: <br />• Year 2 — Pavement Rejuvenator <br />• Year 3 — Crack Seal <br />• Year 5 — Refresh Pavement Markings (lf Applicable) <br />• Year 7 — Crack Seal <br />• Year 10 — Refresh Pavement Markings (If Applicable) <br />• Year 14 — Crack Seal <br />• Year 15 — Refresh Pavement Markings (If Applicable) <br />• Year 20 — Overlay or Reconstruction <br />The above schedule is the typical maintenance schedule based off assumed ideal conditions. Staff reviews the condition of <br />all streets annually and adjusts the schedule of maintenance operations based on actual pavement conditions. <br />IP 27-09 2027 Crack Seal Improvements <br />Crack sealing protects pavement by preventing stormwater runoff from seeping through cracks in the pavement and joints <br />between the pavement and concrete curb and gutter, and utility castings. Reducing future pavement damage due to wet <br />subgrade soils, especially during freeze -thaw cycles. <br />Preliminary review estimates a total of 19.93 miles at an estimated cost of $251,000. <br />IP 27-10 2027 Pavement Rejuvenation Improvements <br />The city uses Reclamite, a pavement rejuvenator, as a front-end treatment to extend the useful life of pavement by 5 — 7 <br />years. Reclamite penetrates, rejuvenates and seals the top '/2 to 1-inch of the bituminous pavement. The product reduces the <br />surface permeability, which in turn prevents air and moisture intrusion. In essence, this is accomplished by restoring the <br />maltenes lost in the asphalt binder due to natural oxidation. <br />Preliminary review estimates a total of 13.46 miles at an estimated cost of $353,000 <br />IP 27-11 2027 Pavement Markin Improvements <br />Pavement markings are a critical component of driver and pedestrian safety, and are a required maintenance operation per <br />MSA rules and standards. <br />Preliminary review estimates a total of 2.03 miles at an estimated cost of $21,000. <br />Project Timelines <br />City Staff is proposing to prepare plans and specifications for 2027 pavement maintenance improvement projects in-house, <br />as part of their normal duties. The following are the proposed general project timelines: <br />
The URL can be used to link to this page
Your browser does not support the video tag.