My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 10/27/2026
Ramsey
>
Public
>
Agendas
>
Council
>
2026
>
Agenda - Council - 10/27/2026
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/29/2026 2:28:22 PM
Creation date
10/27/2026 1:54:21 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
10/27/2026
Supplemental fields
Year
%(Da
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
630
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Understanding of the Project <br />Our team is deeply familiar with your local conditions and needs, based on previous experience completing <br />the source water analysis for the City in 2021. The following section details our knowledge of your unique <br />circumstances, challenges, and potential solutions. <br />The City of Ramsey operates eight wells in the Tunnel <br />City-Wonewoc aquifer. Six wells feed the 10-million-gallon- <br />per-day (MGD) water treatment plant. Summer demand <br />passes 5 MGD. The 2040 maximum day demand is 10.3 <br />MGD. Firm well capacity is 8.3 MGD. Wells #9 and #10 will <br />fill remaining water demand. <br />The City needs a Well Siting Assessment before April 2027. <br />The assessment has two phases: <br />o Phase 1 (Tasks 1 to 7): Desktop study, recommend two <br />to four sites, compare treatment options, and submit <br />the MnDNR Preliminary Well Construction Assessment <br />o Phase 2 (Tasks 8 to 13): Drill and test four test wells, <br />analyze the results, and recommend the well design <br />Wells #9 and #10 are planned for construction in 2027. The <br />test wells must confirm water quantity and quality at the <br />chosen sites before final design starts. Final well design <br />and construction services are outside this RFP. <br />WHAT WE ALREADY KNOW <br />SEH already reviewed publications and mapped the source <br />aquifer for the City in 2021. Key findings that guide this <br />project include the following: <br />o The Tunnel City Group is the uppermost bedrock across <br />most of the City. The Wonewoc Sandstone below it is <br />the more productive unit. <br />o Existing wells are 316 to 390 feet deep with 191 to <br />282 feet of casing. Wells experience 60 to 120 feet of <br />drawdown pumping between 500 to 1,000 gallons per <br />minute (gpm). <br />o Pumping Well 7 at 800 gpm produced 6 to 9 feet of <br />drawdown at Well 8, 2,400 feet away. Transmissivity <br />from that test is about 11,500 gpd/ft. <br />o The 2021 model shows 30 to 40 feet of drawdown <br />1,500 feet from the wellfield on a present-day peak day. <br />Drawdown nearly doubles under 2040 demand. <br />o New wells should be at least 1,500 to 2,000 feet from <br />existing wells. <br />o Four of eight wells exceed the MDH manganese <br />health -based value of 0.100 mg/L. New wells will likely <br />need treatment. <br />rit <br />The 2021 study, completed by SEH for the <br />City of Ramsey, mapped the Tunnel City <br />aquifer thickness. <br />1531. <br />142. <br />130. <br />04360 <br />700551 <br />6.4301 <br />316301 <br />3.10353 <br />3aoa F ; <br />tej <br />Tunnel City Thickness <br />Source Water Fnalyels <br />Cry in Ramoey <br />Minnesota <br />SEH <br />Figure <br />6 <br />■ <br />• <br />The 2021 study, completed by SEH for <br />the City of Ramsey, mapped the Wonewoc <br />aquifer thickness. <br />120.307 <br />100.3 <br />03.5710 <br />00.037 <br />40 1022 <br />13 3075 <br />510352.05 <br />A <br />Wonewoc Thickness <br />SEH <br />City of Ramsey <br />Minnesota <br />Figure <br />6 <br />SHORT ELLIOTT HENDRICKSON INC. <br />WELL SITING ASSESSMENT FOR MUNICIPAL WELLS #9 AND #10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.