My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 10/27/2026
Ramsey
>
Public
>
Agendas
>
Council
>
2026
>
Agenda - Council - 10/27/2026
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/29/2026 2:28:22 PM
Creation date
10/27/2026 1:54:21 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
10/27/2026
Supplemental fields
Year
%(Da
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
630
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MNDNR TIMING <br />A well that needs an appropriation permit may need <br />MnDNR preliminary approval before construction. Aquifer <br />testing cannot start until the MnDNR responds. We will <br />submit the Preliminary Well Construction Assessment in <br />MnDNR Permitting and Reporting System (MPARS) as <br />soon as the City approves the sites. We will contact the <br />MnDNR area hydrologist early in Phase 1. <br />PROPERTY AND RIGHT OF ACCESS <br />Test wells must be drilled on land the City owns or controls. <br />SEH will work with City staff to confirm which properties <br />are available at each recommended site. The City will <br />provide all right -of -access permits and agreements needed <br />for drilling and testing at the selected locations. <br />WINTER FIELD WORK <br />In accordance with the schedule outlined in the RFP, <br />drilling and testing will occur in January through March <br />2027. We plan for cold -weather discharge routing, data <br />logger protection, and site access. <br />Through past success working with <br />the City of Ramsey, we have learned <br />that collaboration between City and <br />SEH staff is key. We will continue <br />to emphasize collaboration and <br />communication to deliver a project <br />that meets your goals. <br />SEH's pumping test setup includes the necessary <br />equipment to accurately measure well performance <br />and drawdown data. <br />SHORT ELLIOTT HENDRICKSON INC. <br />WELL SITING ASSESSMENT FOR MUNICIPAL WELLS #9 AND #10 <br />