MNDNR TIMING <br />A well that needs an appropriation permit may need <br />MnDNR preliminary approval before construction. Aquifer <br />testing cannot start until the MnDNR responds. We will <br />submit the Preliminary Well Construction Assessment in <br />MnDNR Permitting and Reporting System (MPARS) as <br />soon as the City approves the sites. We will contact the <br />MnDNR area hydrologist early in Phase 1. <br />PROPERTY AND RIGHT OF ACCESS <br />Test wells must be drilled on land the City owns or controls. <br />SEH will work with City staff to confirm which properties <br />are available at each recommended site. The City will <br />provide all right -of -access permits and agreements needed <br />for drilling and testing at the selected locations. <br />WINTER FIELD WORK <br />In accordance with the schedule outlined in the RFP, <br />drilling and testing will occur in January through March <br />2027. We plan for cold -weather discharge routing, data <br />logger protection, and site access. <br />Through past success working with <br />the City of Ramsey, we have learned <br />that collaboration between City and <br />SEH staff is key. We will continue <br />to emphasize collaboration and <br />communication to deliver a project <br />that meets your goals. <br />SEH's pumping test setup includes the necessary <br />equipment to accurately measure well performance <br />and drawdown data. <br />SHORT ELLIOTT HENDRICKSON INC. <br />WELL SITING ASSESSMENT FOR MUNICIPAL WELLS #9 AND #10 <br />