wells and can be exported for the report and the MDH <br />well record <br />o SEH will review well construction as -built construction <br />against the specification, including casing depths, <br />grout volumes, and open hole interval, for the MDH well <br />construction record <br />V Deliverables: Boring log and well construction diagram <br />for each test hole and test well, with photo log. <br />Assumptions: One 10-hour field day per test hole and test <br />well, four test wells total, as stated in the RFP. <br />Our certified geologists log cuttings and core during <br />drilling, identifying geology such as the bagged <br />Rotosconic drilling samples pictured here, consisting <br />of clay, sand, weathered bedrock, and bedrock. <br />Bedrock core is documented by depth, as depicted <br />here with this 40 to 50 feet interval log. <br />'4 <br />TASK ® AQUIFER PUMPING TEST <br />WORK PLAN AND IMPLEMENTATION <br />SEH will prepare an aquifer pumping test work plan <br />and run a 72-hour constant -rate test on each test well. <br />The work plan will follow MnDNR and MDH aquifer <br />test guidance and will be submitted with the Task 7 <br />assessment. SEH will: <br />o Prepare the work plan with the pumping rate, duration, <br />observation well network, water level measurement <br />schedule, discharge routing, and data quality checks for <br />each test <br />o Install up to two pressure transducer data loggers for <br />each test per the RFP, one in the pumping well and one <br />in an observation well, and program them for operation <br />for the full 10-day monitoring period <br />o Collect 72 hours of background water level data <br />before pumping to define natural trends and <br />barometric effects <br />o Direct the drilling contractor during the 72-hour <br />pumping period, including pump start, rate control, <br />flow measurement, and manual water level checks <br />(SEH staff will be on site at the start of the background <br />period, the start of pumping, and the start of recovery) <br />o Monitor recovery after pumping stops until water levels <br />return to near static <br />o Collect water quality samples at the end of each <br />pumping test for general chemistry, iron, manganese, <br />hardness, nitrate, and other parameters agreed with <br />the City, with field measurement of pH, temperature, <br />specific conductance, dissolved oxygen, and ORP <br />(Samples will be analyzed by a certified laboratory) <br />o Download and check data logger records after each test <br />V Deliverables: Aquifer pumping test work plan and <br />field data for each test, including logger files, manual <br />measurements, and laboratory results. <br />TASK ® DATA ANALYSIS AND REPORT <br />SEH will analyze each pumping test and recommend a <br />public water supply well design for Wells #9 and #10. <br />SEH will: <br />o Correct water level data for barometric and background <br />trends and analyze each test in AQTESOLV with the <br />analytical solution that fits the aquifer conditions <br />(such as Theis, Cooper -Jacob, or Hantush-Jacob <br />leaky aquifer) <br />o Calculate transmissivity, hydraulic conductivity, <br />storativity, specific capacity, and well efficiency, <br />and compare the results to the 2021 values and to <br />published well potential criteria <br />o Update the interference and safe -yield evaluation from <br />Tasks 3 and 4 with the measured aquifer parameters <br />o Compare water quality between sites and against MDH <br />treatment requirements <br />o Recommend a production well design for each selected <br />site, including depth, casing diameters and depths, <br />open hole interval, expected capacity, and pump setting <br />SHORT ELLIOTT HENDRICKSON INC. <br />WELL SITING ASSESSMENT FOR MUNICIPAL WELLS #9 AND #10 <br />