My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 10/27/2026
Ramsey
>
Public
>
Agendas
>
Council
>
2026
>
Agenda - Council - 10/27/2026
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/29/2026 2:28:22 PM
Creation date
10/27/2026 1:54:21 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
10/27/2026
Supplemental fields
Year
%(Da
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
630
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
o Prepare a report that summarizes the drilling, <br />geologic logging, aquifer testing, water quality, <br />and preliminary design results, with boring logs, <br />well records, test data, and laboratory reports <br />as attachments <br />o Review the draft report with City staff and <br />incorporate comments before we finalize it <br />V' Deliverables: Draft and final Well Siting <br />Assessment Report. <br />Final well design, MDH plan review, and <br />construction services for Wells #9 and #10 are <br />outside this RFP. SEH can provide those services <br />under a separate agreement. <br />10' <br />lo' <br />to* <br />10' <br />NLINELY <br />VOTES <br />/ Meetings and Project <br />Management <br />SEH will hold a kickoff meeting, a site selection <br />meeting, and a final review meeting with City staff. Project <br />Manager Mark Sherrill will send a short status email every <br />two weeks. <br />Workplan - Summary <br />PHASE 1 I DESKTOP STUDY (TASKS 1 TO 7) <br />DATA AND <br />LITERATURE <br />REVIEW <br />Task 1 <br />Task 1 <br />Task 2 <br />PHASE 2 I TEST WELLS AND AQUIFER TESTS (TASKS 8 TO 13) <br />i <br />TEST WELL <br />SPECIFICATIONS <br />Tasks 8 and 9 <br />SURVEY <br />AND <br />DRILLING <br />Tack 10 <br />Task 11 <br />Transmissivity <br />calculated. <br />1D` <br />10' ID' <br />lo' 10' <br />10' 10' <br />1p' 10' <br />TRANSMISSIVITY <br />W./FT/DAY (tt'/doy) <br />Ig' 10' 1Qs <br />FT'/FT/MIN (fft/min) <br />GAL/FT/DAY ( gal /ft/day) <br />METERS'/METER/DAY (m'/day) <br />10' Ia' 10' <br />SPECIFIC CAPACITY (gal/min/ft) <br />10' 10' <br />WELL POTENTIAL <br />l0' <br />Irrigation,-.. <br />VERY GOOD GOOD) FAIR POOR GOOD FAIR <br />Domestic <br />POOR <br />Transmissivity (T)' KM where <br />K=Permeability <br />M=Saturated thickness of the aquifer <br />Specific capacity values based on pumping period of approximately <br />8-hours but are otherwise generalized. <br />10' IQ' <br />10' <br />0' 10' <br />INFEASIBLE <br />Flamm 2-4.—Comparison or transmissivity, specific capacity, and well potential. 103-D-I406. <br />SEH compares calculated transmissivity to well potential (USBR Ground Water <br />Manual, Figure 2-4). <br />WTP CONNECTION <br />VS. ON -SITE <br />FILTRATION COST <br />Tasks 3 ana 4 <br />CITY APPROVES SITES I MnDNR RESPONDS TO PWCA <br />Task 12 <br />Task 6 <br />ANALYSIS, <br />DESIGN <br />COMMENDATIO <br />REPORT <br />Task 13 <br />SEH will site and test Wells #9 and #10 <br />TECHNICAL <br />MEMO AND <br />MnDNR PWCA <br />Tasks 5 and 7 <br />Deliverable <br />SHORT ELLIOTT HENDRICKSON INC. <br />WELL SITING ASSESSMENT FOR MUNICIPAL WELLS #9 AND #10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.