My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 10/27/2026
Ramsey
>
Public
>
Agendas
>
Council
>
2026
>
Agenda - Council - 10/27/2026
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/29/2026 2:28:22 PM
Creation date
10/27/2026 1:54:21 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
10/27/2026
Supplemental fields
Year
%(Da
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
630
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Schedule <br />The schedule below meets the April 2027 completion date. The MnDNR review period may be outside <br />of SEH's control. The Phase 2 drilling dates depend on right of access to each site and on the drilling <br />contractor schedule. SEH will confirm the drilling window with the City and the contractor when the <br />sites are approved. <br />MILESTONE OR TASK <br />City Council award (anticipated) <br />Notice to proceed and kickoff meeting <br />Task 1: Desktop hydrogeologic evaluation <br />Task 2: Recommend two to four well sites <br />Tasks 3 and 4: Interference and risk <br />evaluation <br />Task 5: Technical Memorandum (draft <br />and final) <br />Task 6: Treatment cost estimates <br />City approval of recommended sites <br />Task 7: MnDNR Preliminary Well - <br />Construction Assessment submitted <br />Tasks 8 and 9: Final locations and <br />specifications <br />MnDNR response received <br />Task 10: Survey and drilling mobilization <br />Task 11: Test hole drilling, logging, and test <br />well installation <br />Task 12: 72-hour aquifer pumping tests (up <br />to four tests) <br />Task 13: Analysis, well design - <br />recommendation, and report <br />Well Siting Assessment complete <br />2026 <br />OCT <br />NOV <br />DEC <br />*Award Deliverable <br />2027 <br />JAN <br />FEB <br />MAR <br />* <br />ASSUMPTIONS <br />1. Drilling subcontractor schedule can meet short turn around. <br />2. Property access to all locations have proper right of entry. <br />APR <br />SHORT ELLIOTT HENDRICKSON INC. <br />WELL SITING ASSESSMENT FOR MUNICIPAL WELLS #9 AND #10 <br />