Laserfiche WebLink
As leader of the Water Practice <br />at SEH, Chris will support <br />the project team beyond <br />day-to-day tasks. <br />3 c <br />YEARS OF <br />r I EXPERIENCE <br />EDUCATION <br />Master of Science <br />Environmental Engineering <br />University of Minnesota -Minneapolis <br />Bachelor of Science <br />Environmental Engineering <br />Michigan Technological <br />University -Houghton <br />REGISTRATIONS/CERTIFICATIONS <br />Professional Engineer in MN <br />PROFESSIONAL ASSOCIATIONS <br />American Water Works Association <br />Chris Larson PE <br />WATER PRACTICE LEAD <br />Chris is a civil and environmental project manager/engineer with extensive <br />experience in development, design, construction and management of a wide <br />variety of projects. His experience covers pilot studies and testing, preliminary <br />engineering studies, design, construction administration, project management <br />and startup and training for water treatment and supply projects. Chris has <br />also provided facility planning, design and construction administration of major <br />sanitary sewer interceptors. He serves as the engineer for the Joint Powers <br />Water Board of St. Michael, Albertville and Hanover, overseeing all of the <br />engineering aspects of a water utility. <br />Chris has led water supply planning, municipal well, and water <br />appropriation projects across the Twin Cities region. <br />EXPERIENCE <br />Centralized Water Treatment Plant — Ramsey, MN <br />Project manager and lead author for evaluation of the City's eight Tunnel City- <br />Wonewoc wells, current and 2040 demands, and iron and manganese treatment <br />alternatives. The study compared a gravity filtration plant, pressure filtration, <br />and a no -treatment baseline, coordinated the source water analysis and Metro <br />Model 3 submodel, and recommended the 10 MGD gravity plant. <br />Aquifer Storage and Recovery, Joint Powers Well 9 (Joint Powers Water Board <br />of Albertville Hanover and St Michael) — St. Michael, MN <br />Chris served as project manager for construction, pilot testing and <br />commissioning for this first Aquifer Storage and Recovery (ASR) well in <br />Minnesota. ASR provides a reservoir of treated drinking water, reducing <br />the needed peak capacity of the plant. Extensive water sampling, analysis <br />and reporting was conducted. The project coordinated MnDNR and MDH <br />requirements for injection and recovery cycles. <br />Northwest Metro Water Study (Metropolitan Council Environmental Services <br />(MCES)) — St. Paul, MN <br />As project manager and primary author, Chris led evaluation of water supply <br />approaches, oversaw concept -level planning, and developed report findings. The <br />study evaluated the feasibility of a joint surface water or groundwater drinking <br />water system for the communities of Corcoran, Dayton, Ramsey and Rogers. <br />Water System Comprehensive Plan (Joint Powers Water Board of Albertville <br />Hanover and St Michael) — Albertville, Hanover and St. Michael, MN <br />Project manager for a water comprehensive plan. The Joint Powers Water Board <br />is a water utility comprising of 3 cities; Albertville, Hanover, and St. Michael. <br />The comprehensive plan evaluated future water demands and planned for <br />additional storage, supply, and treatment based on water use thresholds. The <br />comprehensive plan also included creating a hydraulic water model. The final <br />report included a capital improvements plan for future projects. <br />Augmentation Analysis Report (MCES) — White Bear Lake, MN <br />Project manager responsible for oversight of the team, budget and schedule. <br />The environmental review was completed as a preliminary step in determining <br />one of two options for the project. Areas of dumping, as well as petroleum and <br />non -petroleum releases were identified at sites along the corridor. <br />SHORT ELLIOTT HENDRICKSON INC. <br />WELL SITING ASSESSMENT FOR MUNICIPAL WELLS #9 AND #10 <br />