|
Jeff will lead well design,
<br />evaluating local geology,
<br />infrastructure, and land uses
<br />to support sound decision
<br />making for this project.
<br />3 YEARS OF
<br />EXPERIENCE
<br />EDUCATION
<br />Bachelor of Science
<br />Civil Engineering
<br />University of Colorado -Denver
<br />REGISTRATIONS/CERTIFICATIONS
<br />Professional Engineer in MN, AZ, CO, IA,
<br />IN, MI, MN, MO, ND, NM, NV, OH, SD, TN,
<br />WI, and WY
<br />PROFESSIONAL ASSOCIATIONS
<br />National Society of Professional Engineers
<br />American Water Works Association
<br />Jeff Ledin PE
<br />LEAD WELL ENGINEER
<br />Jeff is a senior drinking water engineer with extensive water supply experience,
<br />especially in the area of public water systems engineering. He develops
<br />test boring and test well programs and has completed numerous well site
<br />investigation reports for cities, towns, and villages across Minnesota and
<br />Wisconsin. The scopes of his work have included project development,
<br />preliminary design, client contact, permitting, design, and construction. He
<br />has served as client contact for several communities and brings a strong
<br />construction background.
<br />Jeff frequently helps municipalities make critical judgement calls for well
<br />projects. He develops test well programs, prepares well specifications,
<br />and leads well design, MDH and MnDNR permitting, and construction for
<br />municipal supply wells across Minnesota.
<br />EXPERIENCE
<br />New Municipal Wells — St. Joseph, MN
<br />Project manager for site selection and development. Jeff was also responsible
<br />for design and construction of three 600 gpm municipal supply wells to serve
<br />new treatment plant. This project involved a new well field and preliminary
<br />design of a 2 MGD water filtration plant. Project tasks included a hydrogeologic
<br />investigation and a pilot treatment plant study.
<br />Aquifer Study and Wells 5, 7, and 9 (Sauk Centre Public Utilities Commission)
<br />— Sauk Centre, MN
<br />Project manager for the Aquifer Study and Well 7 and Pump House, and senior
<br />project engineer for Well 5 and 9. SEH completed a 2014 aquifer study to site
<br />future wells, followed by Well 5 replacement, Wells 7 and pump house design
<br />and construction, and Well 9 design and construction.
<br />Wells 21 and 22 — Lakeville, MN
<br />Project manager for two new municipal wells on one property, drilled to different
<br />depths in separate aquifers, plus two monitoring wells for long-term aquifer
<br />management data required by state agencies.
<br />Wells No. 3 and No. 4 — Moose Lake, MN
<br />Senior water supply engineer responsible for overall quality control for
<br />locating well sites, well design, pumping equipment design, and construction.
<br />This project included the preliminary well siting plan for two new wells,
<br />water distribution system analysis and hydraulic modeling, new pump
<br />house design, MDH permitting, demolition of old wells and well house, and
<br />construction administration.
<br />Well 8 Water Treatment Plant — Village of Sussex, WI
<br />Project engineer for final design and specifications for Well 8. The project
<br />consists of the construction of a new 2.0 MGD water treatment plant for the
<br />removal of radium from Well 8 by hydrous manganese oxide (HMO) treatment.
<br />To accommodate the steep slope of the site, the WTP and backwash tank
<br />were constructed into the hillside. Major elements include a new cavity wall
<br />building, horizontal pressure filter, chemical feed systems, a backwash tank
<br />and generator.
<br />SHORT ELLIOTT HENDRICKSON INC.
<br />WELL SITING ASSESSMENT FOR MUNICIPAL WELLS #9 AND #10
<br />
|