Laserfiche WebLink
Jeff will lead well design, <br />evaluating local geology, <br />infrastructure, and land uses <br />to support sound decision <br />making for this project. <br />3 YEARS OF <br />EXPERIENCE <br />EDUCATION <br />Bachelor of Science <br />Civil Engineering <br />University of Colorado -Denver <br />REGISTRATIONS/CERTIFICATIONS <br />Professional Engineer in MN, AZ, CO, IA, <br />IN, MI, MN, MO, ND, NM, NV, OH, SD, TN, <br />WI, and WY <br />PROFESSIONAL ASSOCIATIONS <br />National Society of Professional Engineers <br />American Water Works Association <br />Jeff Ledin PE <br />LEAD WELL ENGINEER <br />Jeff is a senior drinking water engineer with extensive water supply experience, <br />especially in the area of public water systems engineering. He develops <br />test boring and test well programs and has completed numerous well site <br />investigation reports for cities, towns, and villages across Minnesota and <br />Wisconsin. The scopes of his work have included project development, <br />preliminary design, client contact, permitting, design, and construction. He <br />has served as client contact for several communities and brings a strong <br />construction background. <br />Jeff frequently helps municipalities make critical judgement calls for well <br />projects. He develops test well programs, prepares well specifications, <br />and leads well design, MDH and MnDNR permitting, and construction for <br />municipal supply wells across Minnesota. <br />EXPERIENCE <br />New Municipal Wells — St. Joseph, MN <br />Project manager for site selection and development. Jeff was also responsible <br />for design and construction of three 600 gpm municipal supply wells to serve <br />new treatment plant. This project involved a new well field and preliminary <br />design of a 2 MGD water filtration plant. Project tasks included a hydrogeologic <br />investigation and a pilot treatment plant study. <br />Aquifer Study and Wells 5, 7, and 9 (Sauk Centre Public Utilities Commission) <br />— Sauk Centre, MN <br />Project manager for the Aquifer Study and Well 7 and Pump House, and senior <br />project engineer for Well 5 and 9. SEH completed a 2014 aquifer study to site <br />future wells, followed by Well 5 replacement, Wells 7 and pump house design <br />and construction, and Well 9 design and construction. <br />Wells 21 and 22 — Lakeville, MN <br />Project manager for two new municipal wells on one property, drilled to different <br />depths in separate aquifers, plus two monitoring wells for long-term aquifer <br />management data required by state agencies. <br />Wells No. 3 and No. 4 — Moose Lake, MN <br />Senior water supply engineer responsible for overall quality control for <br />locating well sites, well design, pumping equipment design, and construction. <br />This project included the preliminary well siting plan for two new wells, <br />water distribution system analysis and hydraulic modeling, new pump <br />house design, MDH permitting, demolition of old wells and well house, and <br />construction administration. <br />Well 8 Water Treatment Plant — Village of Sussex, WI <br />Project engineer for final design and specifications for Well 8. The project <br />consists of the construction of a new 2.0 MGD water treatment plant for the <br />removal of radium from Well 8 by hydrous manganese oxide (HMO) treatment. <br />To accommodate the steep slope of the site, the WTP and backwash tank <br />were constructed into the hillside. Major elements include a new cavity wall <br />building, horizontal pressure filter, chemical feed systems, a backwash tank <br />and generator. <br />SHORT ELLIOTT HENDRICKSON INC. <br />WELL SITING ASSESSMENT FOR MUNICIPAL WELLS #9 AND #10 <br />