Laserfiche WebLink
As water operations specialist, <br />John will apply his decades of <br />water operations experience <br />to the project so it's designed <br />with the operator in mind. <br />YEARS OF <br />r 1 EXPERIENCE <br />EDUCATION <br />Certificate <br />Technical Teaching <br />University of Minnesota -Twin Cities <br />REGISTRATIONS/CERTIFICATIONS <br />Class A Water Operator, Minnesota <br />Department of Health <br />PROFESSIONAL ASSOCIATIONS <br />Water Environment Federation <br />Minnesota Wastewater <br />Operators Association <br />American Public Works Association <br />American Water Works Association <br />John Thom <br />WATER OPERATIONS SPECIALIST <br />John is a water production and operations specialist. He brings decades of <br />experience in the management of water and wastewater utilities, including <br />project management, plant studies, plant start-up, maintenance manuals, <br />operation procedures manuals, water and wastewater operator training, and <br />wastewater and water treatment pilot plant designer and operator. John was <br />recognized for outstanding performance in the water and wastewater industry <br />by numerous professional organizations. Previous employment positions <br />include Public Works Superintendent for the City of Pelican Rapids, Vocational <br />Instructor for the state of Minnesota, and Utility Coordinator for the City <br />of Richfield. <br />John supports municipal well projects, providing client -side experience <br />for successful pilot studies, startup, operator training, water quality, and <br />regulatory compliance. <br />EXPERIENCE <br />Well 4 and 5 Water Treatment Plants — Village of Sussex, WI <br />Senior project design leader responsible for process selection, pilot testing, <br />plant startup, and operator training. This project involved the design and <br />construction of improvements to the existing 1.3 MGD Well 4 and the 1.1 <br />MGD Well 5 facilities to include pressure filtration and HMO feed systems for <br />the radium removal while maintaining the existing building footprint. Major <br />elements of the project include the installation of horizontal pressure filters and <br />HMO feed systems in two existing treatment plants as well as the construction <br />of a backwash tank at each plant. <br />Well 31 Facility Construction (City of Madison Water Utility) — Madison, WI <br />Water operations specialist for the distribution and facility planning efforts. The <br />project includes construction of 16-4 ft diameter pressure vessels, pyrolusite <br />media installation, 2,200 gpm vertical turbine well pump, gas chlorine <br />equipment, fluoride equipment, three 2,100 gpm high service pumps and an <br />attached 3,800 SF storage facility with an exterior fenced area for storing <br />Madison Water Utility materials and equipment. This project will be completed <br />in 2018. <br />Well 6 and 8 Water Treatment Plant Expansion — Anoka, MN <br />Senior project design leader responsible for process selection, pilot testing, <br />plant startup, and operator training. Project scope included remodel and <br />addition to a water treatment facility treating iron and manganese to <br />accommodate current and projected community growth. <br />Well No. 2 Well and Well House — Village of Maiden Rock, WI <br />In 2017, the Village of Maiden Rock discovered a hole within their existing Well <br />No. 1 casing. The project involved well site investigation, site selection, and <br />alternatives development that included analysis of geography, existing utility <br />proximity, environmental concerns, and cost. After site and preferred alternative <br />selection, the team proceeded with permitting in coordination with WDNR <br />and the Public Service Commission. Plans and specifications were completed <br />as part of a Safe Drinking Water Loan Program through WDNR and CDBG <br />Programs through the Wisconsin Department of Administration (WDOA). <br />SHORT ELLIOTT HENDRICKSON INC. <br />WELL SITING ASSESSMENT FOR MUNICIPAL WELLS #9 AND #10 <br />