My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Planning Commission - 10/29/2026
Ramsey
>
Public
>
Agendas
>
Planning Commission
>
2026
>
Agenda - Planning Commission - 10/29/2026
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/5/2026 1:52:45 PM
Creation date
11/5/2026 1:47:21 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Planning Commission
Document Date
10/29/2026
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
98
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
GENERAL NOTES <br />1.THE INFORMATION SHOWN ON THESE DRAWINGS CONCERNING TYPE AND LOCATION <br />OF EXISTING UTILITIES IS NOT GUARANTEED TO BE ACCURATE OR ALL INCLUSIVE. <br />THE CONTRACTOR IS RESPONSIBLE FOR MAKING HIS OWN DETERMINATION AS TO <br />TYPE AND LOCATION OF UTILITIES AS NECESSARY TO AVOID DAMAGE TO THESE <br />UTILITIES. <br />2.CALL GOPHER STATE ONE CALL AT LEAST 48 HOURS PRIOR TO ANY EXCAVATIONS <br />FOR EXISTING UTILITIES LOCATIONS. <br />3.THE CONTRACTOR SHALL FIELD VERIFY SIZE, ELEVATION, AND LOCATION OF <br />EXISTING UTILITIES AND NOTIFY ENGINEER OF ANY DISCREPANCIES PRIOR TO THE <br />START OF INSTALLATIONS. <br />4.ALL WORK SHALL BE PERFORMED DURING CITY APPROVED WORKING HOURS. <br />5.PARKING, EQUIPMENT STORAGE OR MATERIAL STORAGE SHALL NOT BE ALLOWED ON <br />PUBLIC STREETS OR WITHIN PUBLIC RIGHT-OF-WAY. <br />6.NOTIFY CITY A MINIMUM OF 48 HOURS PRIOR TO THE COMMENCEMENT OF <br />CONSTRUCTION. <br />7.ALL ELECTRIC, TELEPHONE, AND GAS EXTENSIONS INCLUDING SERVICE LINES SHALL <br />BE CONSTRUCTED TO THE APPROPRIATE UTILITY COMPANY SPECIFICATIONS. ALL <br />UTILITY DISCONNECTIONS SHALL BE COORDINATED WITH THE APPROPRIATE UTILITY <br />COMPANY. <br />8.THE CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING AND MAINTAINING <br />TRAFFIC CONTROL, SUCH AS BARRICADES, WARNING SIGNS, DIRECTIONAL SIGNS, <br />FLAGMEN AND LIGHTS, AS NECESSARY TO CONTROL THE MOVEMENT OF TRAFFIC. <br />EXISTING BITUMINOUS <br />EXISTING CATCH BASIN <br />EXISTING HYDRANT <br />EXISTING WATER MAIN <br />EXISTING GATE VALVE <br />EXISTING CATCH BASIN MANHOLE <br />EXISTING STORM SEWER <br />EXISTING FIBEROPTIC BOX <br />(GUTTERLINE, BITUMINOUS SURFACE, OR GROUND <br />SURFACE UNLESS OTHERWISE INDICATED) <br />920.60 <br />920.99 <br />PROPOSED SPOT ELEVATION <br />EXISTING SPOT ELEVATION <br />PROPOSED SILT FENCES <br />928 PROPOSED CONTOUR <br />EXISTING CONTOUR <br />PROPOSED WATER PIPEEXISTING UNDERGROUND ELECTRICE <br />GE <br />EXISTING SANITARY SEWER <br />PROPOSED SANITARY SEWER PIPEGASEXISTING UNDERGROUND GAS <br />EXISTING LIGHT POLE <br />PROPOSED STORM SEWER PIPE <br />PROPOSED STORM MANHOLE <br />PROPOSED CATCH BASIN <br />EXISTING SANITARY SEWER MANHOLE <br />PROPOSED GATE VALVE <br />PROPOSED DRAINTILE AND CLEAN-OUT <br />EXISTING FLARED-END SECTION <br />EXISTING UNDERGROUND CABLECBL <br />PROPOSED DIRECTION OF DRAINAGE <br />930 <br />4.0% <br />930 <br />WV <br />D <br />PROPOSED INLET PROTECTION <br />EXISTING MISC. MANHOLE <br />S <br />LEGEND <br />AN MPCA NPDES CONSTRUCTION PERMIT IS REQUIRED <br />PRIOR TO THE START OF CONSTRUCTION <br />ALL PERMITS, INCLUDING BUT NOT LIMITED TO <br />PERMITS FROM CITY OF RAMSEY, MNDOT, AND THE <br />MINNESOTA DEPARTMENT OF LABOR AND INDUSTRY, <br />SHALL BE OBTAINED PRIOR TO ORDERING OF <br />MATERIAL AND STARTING OF CONSTRUCTION. NO <br />INSTALLATION OF UTILITIES SHALL BE PERMITTED <br />UNTIL ALL APPLICABLE PERMITS ARE RECEIVED BY <br />CONTRACTOR. INSTALLATION OF UTILITIES SHALL BE <br />CONSTRUCTED TO MINNESOTA DEPARTMENT OF <br />LABOR AND INDUSTRY STANDARDS AND CITY <br />STANDARDS AS IDENTIFIED IN THE PUBLIC <br />WORKS/ENGINEERING STANDARDS. <br />865 <br />. <br />7 <br />8 <br />CB <br />8 <br />6 <br />5 <br />. <br />5 <br />3 <br />T <br />C <br />C <br />B <br />864. <br />9 <br />9 <br />CBF <br />L <br />86 <br />6 <br />. <br />4 <br />86 <br />5 <br />. <br />8 <br />86 <br />5 <br />. <br />5 <br />866.85 <br />MHSAN <br />PROPOSED <br />BUILDING <br />FFE 867.20 <br />2.0 <br />% <br />2.0 <br />% <br />4.9 <br />% <br />1.2 <br />% <br />2.0 <br />% <br />1.5 <br />% <br />2.4 <br />% <br />2.0 <br />% <br />5.0 <br />% <br />2.0 <br />% <br />12 <br />% <br />11 <br />% <br />2.0 <br />% <br />TOC <br />TOC <br />2.0 <br />% <br />2.0 <br />% <br />4.9 <br />% <br />2.0 <br />% <br />2.0 <br />% <br />4.9 <br />% <br />TOC <br />TOC <br />TOC <br />TOC <br />TOC <br />4.2 <br />% <br />866.52 <br />867.15 <br />866.33 <br />865.82 <br />865.68 <br />865.90 <br />865.78 <br />4.2 <br />% <br />2.0 <br />% <br />TOC <br />866.29 <br />2.0 <br />% <br />4.9 <br />% <br />TOC <br />866.25 <br />2.0 <br />% <br />2.0 <br />% <br />1.0 <br />% <br />1.9% <br />1.5 <br />% <br />1.0 <br />% <br />1 <br />. <br />9 <br />% <br />TRANSITION TO ZERO CURB <br />HEIGHT AT PED. RAMPS (TYP) <br />866.77 <br />866.85 <br />867.30 <br />867.42 <br />866.56 <br />866.50 <br />866.57 <br />866.66 <br />866.76 <br />866.64 <br />867.00 <br />866.65 <br />866.65 <br />866.53 <br />866.53 <br />867.00 <br />865.80 <br />865.92 <br />866.02 <br />866.14 <br />866.60 <br />866.87 <br />866.92 <br />866.83 <br />866.37 <br />866.49 <br />866.58 <br />866.58 <br />867.20 <br />867.20 <br />865.60 <br />866.90 <br />866.90 <br />865.55 <br />867.20 <br />867.08 <br />866.00 <br />866.50 <br />866.45 <br />866.22 <br />866.60 <br />867.20 <br />866.86 <br />867.00 <br />867.00 <br />867.00866.70 <br />866.82 <br />867.33 <br />865.90 <br />866.70 <br />865.80NO <br />R <br />T <br />H <br />1 INCH = 10 FEET <br />HORIZONTAL <br />10 0 5 10 20 <br />(22" x 34") <br />S:\PLOWE\CAD\26PROJ\2268 GATHER (RAMSEY)\2268 CAD\2268 BASE 3.DWG <br />Thursday, October 15, 2026 3:05:45 PM <br />SHEET <br />C2.2 <br />26-2268 <br />R <br />Call before you dig. <br />below.Know what's <br />FA <br />X <br />: <br /> <br />( <br />6 <br />5 <br />1 <br />) <br /> <br />3 <br />6 <br />1 <br />- <br />8 <br />7 <br />0 <br />1 <br />PH <br />O <br />N <br />E <br />: <br /> <br />( <br />6 <br />5 <br />1 <br />) <br /> <br />3 <br />6 <br />1 <br />- <br />8 <br />2 <br />1 <br />0 <br />LI <br />N <br />O <br /> <br />L <br />A <br />K <br />E <br />S <br />, <br /> <br />M <br />N <br /> <br />5 <br />5 <br />0 <br />1 <br />4 <br />67 <br />7 <br />6 <br /> <br />L <br />A <br />K <br />E <br /> <br />D <br />R <br />I <br />V <br />E <br />SU <br />I <br />T <br />E <br /> <br />1 <br />1 <br />0 <br />SI <br />T <br />E <br /> <br />P <br />L <br />A <br />N <br />N <br />I <br />N <br />G <br />& <br />E <br />N <br />G <br />I <br />N <br />E <br />E <br />R <br />I <br />N <br />G <br />PL <br />O <br />W <br />E <br />EN <br />G <br />I <br />N <br />E <br />E <br />R <br />I <br />N <br />G <br />, <br /> <br />I <br />N <br />C <br />. <br />PR <br />E <br />P <br />A <br />R <br />E <br />D <br /> <br />F <br />O <br />R <br />: <br /> <br /> <br />E <br />L <br />E <br />V <br />A <br />T <br />E <br /> <br />H <br />O <br />P <br />E <br />GA <br />T <br />H <br />E <br />R <br />RA <br />M <br />S <br />E <br />Y <br />, <br /> <br />M <br />N <br />MQ <br />A <br />AG <br />CH <br />E <br />C <br />K <br /> <br />B <br />Y <br />: <br />DR <br />A <br />W <br />N <br /> <br />B <br />Y <br />: <br />26 <br />- <br />2 <br />2 <br />6 <br />8 <br />DA <br />T <br />E <br />: <br />JO <br />B <br /> <br />N <br />O <br />: <br />09 <br />/ <br />1 <br />1 <br />/ <br />2 <br />6 <br />DE <br />S <br />C <br />R <br />I <br />P <br />T <br />I <br />O <br />N <br />DA <br />T <br />E <br />NO <br />. <br />Da <br />t <br />e <br />: <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />L <br />i <br />c <br />e <br />n <br />s <br />e <br /> <br />N <br />o <br />. <br /> <br />4 <br />3 <br />9 <br />6 <br />3 <br />AD <br />A <br />M <br /> <br />G <br />I <br />N <br />K <br />E <br />L <br />10 <br />. <br />1 <br />9 <br />. <br />2 <br />0 <br />2 <br />6 <br />I <br />h <br />e <br />r <br />e <br />b <br />y <br /> <br />c <br />e <br />r <br />t <br />i <br />f <br />y <br /> <br />t <br />h <br />a <br />t <br /> <br />t <br />h <br />i <br />s <br /> <br />p <br />l <br />a <br />n <br /> <br />w <br />a <br />s <br /> <br />p <br />r <br />e <br />p <br />a <br />r <br />e <br />d <br /> <br />b <br />y <br /> <br />m <br />e <br />or <br /> <br />u <br />n <br />d <br />e <br />r <br /> <br />m <br />y <br /> <br />d <br />i <br />r <br />e <br />c <br />t <br /> <br />s <br />u <br />p <br />e <br />r <br />v <br />i <br />s <br />i <br />o <br />n <br /> <br />a <br />n <br />d <br /> <br />t <br />h <br />a <br />t <br /> <br />I <br /> <br />a <br />m <br /> <br />a <br /> <br />d <br />u <br />l <br />y <br />li <br />c <br />e <br />n <br />s <br />e <br />d <br /> <br />p <br />r <br />o <br />f <br />e <br />s <br />s <br />i <br />o <br />n <br />a <br />l <br /> <br />e <br />n <br />g <br />i <br />n <br />e <br />e <br />r <br /> <br />u <br />n <br />d <br />e <br />r <br /> <br />t <br />h <br />e <br /> <br />l <br />a <br />w <br />s <br /> <br />o <br />f <br />th <br />e <br /> <br />S <br />t <br />a <br />t <br />e <br /> <br />o <br />f <br /> <br />M <br />i <br />n <br />n <br />e <br />s <br />o <br />t <br />a <br />. <br />GR <br />A <br />D <br />I <br />N <br />G <br /> <br />D <br />E <br />T <br />A <br />I <br />L <br />S <br />8 7 5 4 3 2 16 <br />CI <br />T <br />Y <br /> <br />R <br />E <br />V <br />I <br />E <br />W <br /> <br /># <br />1 <br />10 <br />. <br />0 <br />6 <br />. <br />2 <br />6 <br />CI <br />T <br />Y <br /> <br />R <br />E <br />V <br />I <br />E <br />W <br /> <br /># <br />2 <br />10 <br />. <br />1 <br />9 <br />. <br />2 <br />6
The URL can be used to link to this page
Your browser does not support the video tag.