Laserfiche WebLink
<br />10) Gas operations that are located in the City's wellhead protection area must <br />meet the following standards: <br />a) Double walled storage tanks with corrosion protection. <br />b) Spill protection to catch spills that may occur during delivery of <br />products. <br />c) Overfill protection including automatic shutoff devices, overfill <br />alarms and ball float valves or approved equal. <br />d) Leak detection, including interstitial monitoring of the double walled <br />tank. <br />e) Product release monitoring, including installation of groundwater <br />monitoring wells and monthly monitoring of these wells will be <br />required only after a reportable leak or spill has been detected. <br />f) Tank Tightness Testing on an annual basis. <br />g) Annual reports summarizing monthly monitoring results, monthly <br />inventory control, and tank tightness testing. <br /> <br />b. Development Standards <br /> <br /> <br /> acre <br />20 feet 80 feet 40 feet 40 feet 20 feet n/a <br />80 feet 100 feet 80 feet 80 feet 80 feet n/a <br />>15 >15 None None 4a- up tol0 n/a <br />DU/AC DU/AC 4b-upto 15 <br /> 4c - min. of 15 <br />.75 .25 .25 .25 n/a n/a <br /> <br />0-5 feet as <br />measured <br />from <br />building <br />front to <br />right-of- <br />way(b) (60% <br />of front <br />fa~ade w/in <br />max.) <br /> <br />as <br />measured <br />from <br />building <br />front to <br />right-of- <br />way(b) <br /> <br />as <br />measured <br />from <br />building <br />front to <br />right-of- <br />way(b) <br /> <br />30 feet <br />min, 60 <br />feet max_as <br />measured <br />from <br />building <br />front to <br />right-of- <br />way(b) <br /> <br />Ordinance #07-06 <br />Page 6 of 23 <br />