Laserfiche WebLink
way to reduce the impact to the adjacent townhome residents, however, staff has some concerns about <br />truck traffic being diverted through the neighborhood to access this dock, and buck maneuvering <br />patterns to back into the dock. <br />Some revisions aze required to the grading, utility, and landscaping plans. A permit is required from <br />the Lower Rum River Water Management Organization (LRRWMO) for this project. <br />City Code restricts building height to 45 feet in The MU-PUD district, which the submittal meets. The <br />applicant has indicated that the buildings will be constructed of brick, cultured stone, and stucco on <br />the front facades, and stucco and face block on the reaz facades, all of which meets City Code <br />requuements..Staff is recommending that the roofline features indicated on the front of the buildings <br />be carried over to the building elevation facing the townhomes on jasper Stand 138'° Avenue, at least <br />on the comers of the building. . <br />Recommendation: <br />The submitted plans generally meet the requirements established in City Code, therefore staff is <br />recommending approval of the preliminary site plan contingent upon compliance with City Staff <br />review letter dated Mazch 30, 2007. <br />Commission Action: <br />Motion-to recommend that the City Council approve the preliminary site plan for the Hack Center, <br />contingent upon compliance with the City Staff review letter dated Mazch 30, 2007. <br />_aT_ <br />Motion~to recommend that the City Council deny the preliminary site plan. <br />Review Checklist: <br />Assistant Community Development Director <br />PC: 4/5/07 <br />