Laserfiche WebLink
Hack Center: Preliminary Site Plan Review <br />March 30, 2007 <br />Page 5 of 5 <br />Park and Trail Dedication: Pazk and trail dedication fees will be assessed as part of the plat for <br />the Hack Center <br />Stormwater Management Fee: The 2007 stormwater managemeni fee is $4,151.00 per <br />commercial acre, for a total of $38,604.00. A cash payment will be required before issuance of a <br />building permit <br />REU Number: The Residential Equivalent Unit (REU) is a method by assessing accurate <br />quarterly usage chazges for stormwat er m~ g~ of the yeaz and on an annual basis f pervious <br />surface covernge. The rate will Chang <br />Easements: Drainage and utility easement will be required over the. sanitary' sewer and <br />watermain which are constructed to City standards for these utilities. The storm sewer shall be <br />privately owned and maintained storm water Ponds. <br />Outside Agency Review: Although tins development is not proposing to gain access from State <br />Highway #10, the City is required to n°hfY MnDOT when development occurs ad)aceat to a <br />State Highway. The plans have been submitted to MnDOT. <br />The Planning Commission will be meeting at 7:00 p.m. on Thursday, April 5, 2007 at the <br />Ramsey Municipal Center, 7550 Suawood Drive, to review your proposed site plan and sketch <br />plan. You ox your representative should be present to answer any questions that may arise. <br />Thank you for your cooperation in this Process. <br />Lf you have any questions, please call us at (763) 427-1410. <br />Respectfully, <br />CITY OF RAMSEY <br />i <br />Amy Ge er, AICP <br />~Associ Planner <br />Steve Jankowski, PE <br />City Eneineer <br />Cc: Doug Stahl <br />Pioneer Engineering <br />201 85'~ Avenue AT4J <br />Coon Rapids MN 55433 <br />