Laserfiche WebLink
CITY to be adequate to aid in the operation and maintenance of street lights in locations. <br />• within the Plat determined by the City Engineer and installed by Connexus for the first three <br />(3) years after final plat approval. The CITY will bill residents in the Plat at least quarterly <br />for street light maintenance and operation costs; billing will be initiated at the time a <br />residence connects to municipal grater and sanitary sewer. The DEVELOPER will pay to <br />the CITY an amount equal to 100% of the City Engineer's estimated construction cost of the <br />items prior to recording of the final Plat. The City Engineer's estimated cost of construction <br />is: <br />a) <br />Street striping and signing (1 @$200) <br />$ 200.00 <br />b) <br />Traffic signing (1 @$200) <br />$ 200.00 <br />c) <br />Future Through Street signing (2 @$200) <br />$ 400.00 <br />d) <br />Street lights (8 @$1500) <br />$12,000.00 <br />e) <br />Street light maintenance ( 8 @$270) <br />$2,160.00 <br />f) <br />Street sweeping <br />$ 300.00 <br />g) <br />S eal coating (8,800 sq. yds (a�$.85/�. vd.l <br />$7,480.00 <br />( "Stage H Improvements ") Total $22,740.00 <br />13. Hard Surfaced Driveways. Hard surfaced driveways (bituminous or concrete) are a <br />requirement for each lot in the Plat. Said improvement shall be installed by the building <br />permit applicant or the homeowner at the time the Certificate of Occupancy is issued or as <br />soon thereafter as possible, weather permitting. In the event this improvement is not timely <br />installed on a lot, the DEVELOPER and/or the DEVELOPER'S assign(s), agrees that the <br />CITY may install said improvement on the lot and specially assess the cost therefore against <br />the lot. The DEVELOPER hereby waives all right to a public hearing and other statutory <br />rights or City Charter rights granted a property owner relating to special assessments, <br />including the right to appeal the special assessment for installation of the hard surfaced <br />driveway. In addition, the DEVELOPER grants the CITY a license to enter on each lot of <br />the Plat in order to install the improvement described in this paragraph if the same has not <br />been previously constructed. <br />14. Street Cleaning. After the street surfacing is installed, the DEVELOPER shall clear any <br />soil, earth, or debris from the streets within the Plat resulting from any construction within <br />the Plat by the DEVELOPER or its successors and assigns. From time to time, the CITY <br />may remove accumulations of soil, earth and debris from the streets resulting from the <br />construction of the Plat. It shall.be the DEVELOPER'S responsibility to pay the costs <br />associated with this necessary street cleaning. Invoices from the CITY to the DEVELOPER <br />for such costs shall be paid within fifteen (15) days of the date of invoice. <br />SECTION III <br />PER?vHTS AND OCCUPANCY <br />Brookfield Third Addition <br />Development Agreement <br />Page 5 of 11 <br />—101— <br />