Laserfiche WebLink
... is <br />City of Ramsey Municipal Center I G ! A L <br />CHANGE ORDER <br />City of Ramsey CHANGE ORDER NUMBER: 1061 -17 <br />7550 Sunwood Drive DATE: 25- Jan -2007 <br />Ramsey, MN CONTRACTOR DATE: 25- May -2005 <br />CONTRACTOR FOR: RM -1061: General Trades <br />PROJECT NUMBER: 060229 <br />PROJECT NAME: Municipal Center \Construction \Contracts \1061 - George Cook <br />TO CONTRACTOR: George F. Cook Construction Co <br />2300 Nevada Ave N, Suite 200 <br />Golden Valley, MN 55427 <br />The Contract is changed as follows: <br />FCA 136 - Furnish and install 1 wall mounted bracket and fire <br />Add <br />$144.00 <br />extinguisher for elevator equipment room F130. <br />FCA 147 - Furnish and install wood blocking in Concourse F122 &_F123, <br />Add <br />$1,172.00 <br />per detail 11 B/67, <br />FCA 153 - Install fire treated plywood in F112. <br />Add <br />$210.00 <br />FCA 184 - Staighten frame'fcr door F149B. <br />Add <br />$378.00 <br />FCA 202 - $5161 from original pricing less actual pricing of $4270.00 <br />Credit <br />$891.00 <br />FCA 219 - Supply and install shades at S214A <br />Add <br />$709.00 <br />FCA 220 - Supply and install 2 motorized shades at Training Room <br />Add <br />$ <br />PR 94 - Add window shades at Breakroom F222 <br />Add <br />$1„195.0 <br />TOTAL CHANGES: <br />Add <br />6,700.00' <br />• <br />Not valid until signed by the general contractor and the owner. • <br />Signature of the owner indicates agreement herewith, including any adjustment in the Contract Sum or the Contract Time. <br />The Original Contract Amount was <br />Net change by previously authorized Change Orders <br />The Current Contract Amount prior to this Change Order was <br />The Current Contract Amount will be increased by this Change Order in the amount of <br />The new Current Contract Amount including this Change Order will be <br />The Contract Time will be unchanged. <br />The date of Substantial Completion as of the date - of this Change Order therefore is <br />BKV Group, Inc. George F Cook Construction Co City of Ramsey <br />Minneapolis, MN Golden Valley, MN Ramsey, MN 1 <br />ARCHITECT TRA TOR f <br />B <br />43M�Z ©� By <br />Date Date Dhte <br />$698,000.00 <br />$62,671.27 <br />$760,671.27 <br />$6,700.00 <br />$767,371.27 <br />31 -Aug -2006 <br />• <br />—76— <br />