My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 05/08/2007
Ramsey
>
Public
>
Agendas
>
Council
>
2007
>
Agenda - Council - 05/08/2007
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/19/2025 1:21:06 PM
Creation date
5/4/2007 3:11:40 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
05/08/2007
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
184
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City.of Ramsey Municipal Center <br />CHANGE ORDER <br />CR IGINIA 1 <br />• City of Ramsey CHANGE ORDER NUMBER: 1D61 -19 <br />7550 Sunwood Drive DATE: 07- Mar -2007 <br />Ramsey, MN CONTRACTOR DATE: 25- May -2005 <br />CONTRACTOR FOR: RM -1061: General Trades <br />PROJECT NUMBER: 060229 <br />PROJECT NAME: Municipal Center \Construction\Gontracts11061 - George Cook - <br />TO CONTRACTOR: George F. Cook Construction Co r <br />2300 Nevada Ave N, Suite 200 <br />Golden Valley, MN 55427 <br />The Contract is changed as follows: <br />FCA 209 - Additional keys (BA4, BA8, BA9, SKDS, SKD6, and SKD3} Add $199.00 <br />FCA 222 - Furnish and install one threshold at opening F247 Add $171.OD <br />FCA 223 B- Furnish and install one wood door at F241 and add 36" Add $1,848:00 <br />armor plates at F241 and F107. <br />FCA 52 - Reinstallation of 2x2 blocking at south side of the clerestory. Add $1,330.00 <br />TOTAL CHANGES: Add $3,548.00 <br />Not valid until signed by the general contractor and the owner. <br />Signature of the owner indicates, agreement herewith, including any adjustment in the Contract Sum or the Contract Time. <br />The Original Contract Amount was $698,ODO.00 <br />Net change by previously authorized Change Orders $81,463.93 <br />The Current Contract Amount prior to this Change Order was $779,463.93 <br />• The Current Contract Amount will be increased by this Change Order in the amount of $3,548.00 <br />The new Current Contract Amount including this Change Order will be $783,011.93 <br />The Contract Time will be unchanged. <br />The date of Substantial Completion as of the date of this Change Order therefore is 31- Aug -2006 <br />BKV Group, Inc. <br />Minneapolis, MN <br />Date <br />George F. Cook Construction Co <br />Golden Valley, MN <br />CONTRACTOR <br />B ''?,j�� - �(�c , <br />Date <br />3D /I - Minneapolis <br />Minneapolis, MN. <br />CONSTRUCTION MANAGER <br />By <br />Date <br />• <br />—77— <br />r'ity of Rnmcc+v <br />
The URL can be used to link to this page
Your browser does not support the video tag.