Laserfiche WebLink
-150- <br /> <br />10 03 1~: I4p <br /> <br />SRF Consulting Group Inc 763 ~75 242S <br /> <br />Mr. Steve Jankowski <br /> <br />14- <br /> <br />November 26, 2002 <br /> <br />· Under year 2025 future conditions, the intersecuon of TH 10/Ramsey Boulevard will <br /> operate at LOS E for both peak hours. The intersection of TH 10/Sunfish Lake Boulevard <br /> will operate at LOS F for both peak hours. The level of service results at the intersection <br /> of TH 10/Ramsey Boulevard are metered by westbound capacity constraints at TH' <br /> 10/Sunfish Lake Boulevard. Alt key intersections are expected to operate at-acceptable <br /> levels with the fotlowing recommended improvements: <br /> <br /> · Year 2005 improvements <br /> <br /> · Additional eastboundJwestbound through lane on TH l0 <br /> <br /> · The addition of southbound dual left-turn lanes, a separate through and right- <br /> turn lane for the north approach and a second left-turn lane for the east <br /> approach at the TH i0/Ramsey Boulevard intersection <br /> <br />· Based on the recommended improvements for year 2025 conditions, the south approach <br /> of the intersection of TH 10/Ramsey Boulevard will require 100-120 feet of right-of-way. <br /> <br />p.1S I <br /> <br />I <br />I <br />I <br /> <br /> <br />