My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 03/11/2003
Ramsey
>
Public
>
Agendas
>
Council
>
2003
>
Agenda - Council - 03/11/2003
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/24/2025 3:46:03 PM
Creation date
6/23/2003 1:54:45 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
03/11/2003
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
329
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
'1 <br /> I <br /> I <br /> <br />PART 1 - GENERAL <br /> <br /> · CITY OF RAMSEY <br />CENTRAL pARK ENTRANCE RENOVATION <br />IRRIGATION SPECIFICATIONS <br /> <br />.' :~-'.; .. February 7, 2003 <br /> <br />1.01 <br /> <br />1.02 <br /> <br />1.03 <br /> <br />1.04 <br /> <br />1.05 <br /> <br /> RELATED DOCUMENTS: .., <br /> A. The conditions Contract ( General; Supplementary and other Conditions) and the General <br /> requirements (sections of Division 1) are hereby made part of this section <br /> B. Section 02955 - Trees and Shrubs <br /> C. Section'02930- Sodding <br /> <br /> SCOPE: <br /> A. Fhrnish and install the complete underground irrigation systeminc. luding all.labor}' ..... <br /> materials, equipment and apparatus for the testing, re-testing and i'e,adjusting as '" <br /> required to place the system in an approved operational condition. The -Work shall . <br /> include, but not limited to, the following: <br /> 1. Arrange for, obtain and pay for necessary permits, bonds, and fees. <br /> 2. Excavating and backfill for all work as specified'herein. <br /> Supply and install complete irrigation system including controllers, connection <br /> · .. t%backflow preventer, and all related irrigation equipment included in design. <br /> '..31~ .... Program controller (clock.-) to fully incorporate proposed irrigation system <br /> .'... 'i.' ':'.4. .. Test: The entire testing of the underground piping system. ' - <br /> '..'. ' , .. '5~,. " Furnish, at no expense.to the oWner, a technician to instruct- the Owner's .,' <br /> '- " ope~:ating personnel in the maintenance and operation of the system. <br /> <br /> QUALIFICATIONS: <br /> A. Installer to be an irrigation contractor wh° has hadat least 5 years continuous, <br /> satisfactory, and documented experience installing underground irrigation Systems of a <br /> similar size and type. <br /> <br /> SUBMITTALS: <br />A. Contractor shall furnish the articles, equipment, materials, Or processes specified name in <br /> the drawings and specifications. NO substitutiong will be allowed unless approved in <br /> writing by owner. <br />B. Contractor ~hall provide "As Built" .drawings showing all changes from the original <br />" design and specifications and exact" as,built" locations, sizes, and types of equipment. <br /> Prints of the original design are available from the Owner at cost. <br /> <br />EXAMINATION OF SITE: <br />A. The submission of any proposal in respect to the above named project shall be <br /> considered evidence that the Contractor has examined the site: <br /> <br />1.06 ' <br /> <br />'CONDUCT OF WORK: <br />A. The Contractor shall maintain a skilled journeyman on the jobsite during.progress, <br /> together with a competent superintendent who has the authority to act in all matters <br /> pertaining.to the work specified herein. · <br /> <br />B. The Contractor shall coordinate his work with the other trades and, in particular, the .....':'." <br /> · landscape construction. ~. , . . <br />C. ''. '. The Contractor shall confine his operations to -the a~eas t(~ be impi:Oved a.nd all0tted'ta . !; :}' <br /> <br />... -257- <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.